Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
0805J5003P90DFT
Knowles
CAP CER 3.9PF 500V C0G/NP0 0805

MPQ: 3000

Lead Time: 9-12Days

-- --
7900
Total: $
HDSP-5703
Broadcom(Avago)
DISPLAY 7SEG 0.56" SGL YLW 10DIP

MPQ: 320

Lead Time: 9-12Days

-- --
1900
Total: $
0805J5003P90DAT
Knowles
CAP CER 3.9PF 500V C0G/NP0 0805

MPQ: 3000

Lead Time: 9-12Days

-- --
6500
Total: $
HDSP-H511-GH000
Broadcom(Avago)
DISPLAY 7SEG 0.56" SGL GRN 18DIP

Lead Time: 9-12Days

-- --
9500
Total: $
0805J5003P30DFT
Knowles
CAP CER 3.3PF 500V C0G/NP0 0805

MPQ: 3000

Lead Time: 9-12Days

-- --
5500
Total: $
HDSP-5503-GH000
Broadcom(Avago)
DISPLAY 7SEG 0.56" SGL RED 10DIP

Lead Time: 9-12Days

-- --
8200
Total: $
0805J5003P30DAT
Knowles
CAP CER 3.3PF 500V C0G/NP0 0805

MPQ: 3000

Lead Time: 9-12Days

-- --
6500
Total: $
HDSP-U201
Broadcom(Avago)
DISPLAY 7SEG 0.31" SGL RED 10DIP

MPQ: 200

Lead Time: 9-12Days

-- --
9000
Total: $
0805J5002P70DFT
Knowles
CAP CER 2.7PF 500V C0G/NP0 0805

MPQ: 3000

Lead Time: 9-12Days

-- --
7600
Total: $
HDSP-U203
Broadcom(Avago)
DISPLAY 7SEG 0.31" SGL RED 10DIP

Lead Time: 9-12Days

-- --
4200
Total: $
0805J5002P70DAT
Knowles
CAP CER 2.7PF 500V C0G/NP0 0805

MPQ: 3000

Lead Time: 9-12Days

-- --
200
Total: $
0805J5002P20DFT
Knowles
CAP CER 2.2PF 500V C0G/NP0 0805

MPQ: 3000

Lead Time: 9-12Days

-- --
5200
Total: $
HDSM-531H
Broadcom(Avago)
DISPLAY 7SEG 0.56" SGL GRN 10SMD

Lead Time: 9-12Days

-- --
9000
Total: $
HDSM-533H
Broadcom(Avago)
DISPLAY 7SEG 0.56" SGL GRN 10SMD

MPQ: 1000

Lead Time: 9-12Days

-- --
2200
Total: $
0805J5002P20DAT
Knowles
CAP CER 2.2PF 500V C0G/NP0 0805

MPQ: 3000

Lead Time: 9-12Days

-- --
9600
Total: $
0805J5001P80DFT
Knowles
CAP CER 1.8PF 500V C0G/NP0 0805

MPQ: 3000

Lead Time: 9-12Days

-- --
1800
Total: $
HDSP-F403
Broadcom(Avago)
DISPLAY 7-SEG 0.4" SGL ORG 10DIP

Lead Time: 9-12Days

-- --
2900
Total: $
HDSP-H513
Broadcom(Avago)
DISPLAY 7SEG 0.56" SGL GRN 18DIP

Lead Time: 9-12Days

-- --
9800
Total: $
0805J5001P80DAT
Knowles
CAP CER 1.8PF 500V C0G/NP0 0805

MPQ: 3000

Lead Time: 9-12Days

-- --
4900
Total: $
HDSP-F111
Broadcom(Avago)
DISPLAY 7-SEG 0.4" SGL RED 10DIP

MPQ: 200

Lead Time: 9-12Days

-- --
8800
Total: $
  • 1
  • 3575
  • 3576
  • 3577
  • 3578
  • 3579
  • 6670
Go to