Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
VJ0402D3R6CXBAJ
Vishay
CAP CER 3.6PF 100V C0G/NP0 0402

Lead Time: 9-12Days

-- --
9300
Total: $
CIC10J121NC
Samsung
FERRITE BEAD 120 OHM 0603 1LN

Lead Time: 9-12Days

-- --
9000
Total: $
VJ0402D3R6CXBAC
Vishay
CAP CER 3.6PF 100V C0G/NP0 0402

Lead Time: 9-12Days

-- --
8700
Total: $
CIS10P101AC
Samsung
FERRITE BEAD 100 OHM 0603 1LN

Lead Time: 9-12Days

-- --
6800
Total: $
CIS10P181AC
Samsung
FERRITE BEAD 180 OHM 0603 1LN

Lead Time: 9-12Days

-- --
7700
Total: $
CIS10P471NC
Samsung
FERRITE BEAD 470 OHM 0603 1LN

Lead Time: 9-12Days

-- --
8500
Total: $
CIS10P601NC
Samsung
FERRITE BEAD 600 OHM 0603 1LN

Lead Time: 9-12Days

-- --
1600
Total: $
CIB21P150NE
Samsung
FERRITE BEAD 15 OHM 0805 1LN

Lead Time: 9-12Days

-- --
2700
Total: $
VJ0402D3R3CXCAP
Vishay
CAP CER 3.3PF 200V C0G/NP0 0402

MPQ: 10000

Lead Time: 9-12Days

-- --
7900
Total: $
CIB21P300NE
Samsung
FERRITE BEAD 30 OHM 0805 1LN

Lead Time: 9-12Days

-- --
3200
Total: $
CIB21P330NE
Samsung
FERRITE BEAD 33 OHM 0805 1LN

Lead Time: 9-12Days

-- --
2900
Total: $
VJ0402D3R3CXCAJ
Vishay
CAP CER 3.3PF 200V C0G/NP0 0402

Lead Time: 9-12Days

-- --
9400
Total: $
CIB21P470NE
Samsung
FERRITE BEAD 47 OHM 0805 1LN

Lead Time: 9-12Days

-- --
1600
Total: $
CIM21U121NE
Samsung
FERRITE BEAD 120 OHM 0805 1LN

Lead Time: 9-12Days

-- --
9900
Total: $
VJ0402D3R3CXCAC
Vishay
CAP CER 3.3PF 200V C0G/NP0 0402

Lead Time: 9-12Days

-- --
8500
Total: $
CIM21U102NE
Samsung
FERRITE BEAD 1 KOHM 0805 1LN

Lead Time: 9-12Days

-- --
100
Total: $
VJ0402D3R3CXBAP
Vishay
CAP CER 3.3PF 100V C0G/NP0 0402

MPQ: 10000

Lead Time: 9-12Days

-- --
1100
Total: $
VJ0402D3R3CXBAJ
Vishay
CAP CER 3.3PF 100V C0G/NP0 0402

Lead Time: 9-12Days

-- --
9100
Total: $
VJ0402D3R3CXBAC
Vishay
CAP CER 3.3PF 100V C0G/NP0 0402

Lead Time: 9-12Days

-- --
500
Total: $
CIM21J221NE
Samsung
FERRITE BEAD 220 OHM 0805 1LN

Lead Time: 9-12Days

-- --
7400
Total: $
  • 1
  • 3551
  • 3552
  • 3553
  • 3554
  • 3555
  • 6670
Go to