Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
CIM31U601NE
Samsung
FERRITE BEAD 600 OHM 1206 1LN

Lead Time: 9-12Days

-- --
3400
Total: $
CIB31P700NE
Samsung
FERRITE BEAD 70 OHM 1206 1LN

Lead Time: 9-12Days

-- --
1900
Total: $
CIM10U241NC
Samsung
FERRITE BEAD 240 OHM 0603 1LN

Lead Time: 9-12Days

-- --
3800
Total: $
CIM10J800NC
Samsung
FERRITE BEAD 80 OHM 0603 1LN

Lead Time: 9-12Days

-- --
4000
Total: $
GCM32B7U3A122JX01L
Murata
CAP CER 1200PF 1KV U2J 1210

MPQ: 3000

Lead Time: 9-12Days

-- --
5500
Total: $
CIM10J121NC
Samsung
FERRITE BEAD 120 OHM 0603 1LN

Lead Time: 9-12Days

-- --
8500
Total: $
GCM2195C1J153JA16J
Murata
CAP CER 0.015UF 63V C0G/NP0 0805

MPQ: 10000

Lead Time: 9-12Days

-- --
1000
Total: $
CIC10J600NC
Samsung
FERRITE BEAD 60 OHM 0603 1LN

Lead Time: 9-12Days

-- --
3100
Total: $
1210VC224KAT4A
Kyocera Avx Components
CAP CER SMD

MPQ: 10000

Lead Time: 9-12Days

-- --
6100
Total: $
CIC21P101NE
Samsung
FERRITE BEAD 100 OHM 0805 1LN

Lead Time: 9-12Days

-- --
8100
Total: $
GA1210H184MBXAT31G
Vishay
CAP CER 0.18UF 25V X8R 1210

Lead Time: 9-12Days

-- --
2700
Total: $
GA1210H184MBXAR31G
Vishay
CAP CER 0.18UF 25V X8R 1210

MPQ: 10000

Lead Time: 9-12Days

-- --
5700
Total: $
GA1210H184KBXAT31G
Vishay
CAP CER 0.18UF 25V X8R 1210

Lead Time: 9-12Days

-- --
7700
Total: $
CIV05U102NC
Samsung
FERRITE BEAD 1 KOHM 0402 1LN

Lead Time: 9-12Days

-- --
2000
Total: $
GA1210H184KBXAR31G
Vishay
CAP CER 0.18UF 25V X8R 1210

MPQ: 10000

Lead Time: 9-12Days

-- --
9700
Total: $
CIV05J102NC
Samsung
FERRITE BEAD 1 KOHM 0402 1LN

Lead Time: 9-12Days

-- --
7600
Total: $
GA1210H154MBXAT31G
Vishay
CAP CER 0.15UF 25V X8R 1210

Lead Time: 9-12Days

-- --
6700
Total: $
CIV05J182NC
Samsung
FERRITE BEAD 1.8 KOHM 0402 1LN

Lead Time: 9-12Days

-- --
9900
Total: $
GA1210H154MBXAR31G
Vishay
CAP CER 0.15UF 25V X8R 1210

MPQ: 10000

Lead Time: 9-12Days

-- --
7600
Total: $
CIS10P300AC
Samsung
FERRITE BEAD 30 OHM 0603 1LN

Lead Time: 9-12Days

-- --
300
Total: $
  • 1
  • 3546
  • 3547
  • 3548
  • 3549
  • 3550
  • 6670
Go to