Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
HLMP-0103
Broadcom(Avago)
CLIP/RING MOUNT FOR 5MM LEDS

MPQ: 2000

Lead Time: 9-12Days

-- --
3900
Total: $
AFBR-390525RZ
Broadcom(Avago)
FIBER OPTIC RECEIVER 5MBAUD

MPQ: 200

Lead Time: 9-12Days

-- --
7200
Total: $
HLMP-5029
Broadcom(Avago)
HOUSING RA FOR 5MM HIGH DOME LED

MPQ: 2000

Lead Time: 9-12Days

-- --
1200
Total: $
AFBR-395025RZ
Broadcom(Avago)
FIBER OPTIC RECEIVER 50MBAUD

MPQ: 200

Lead Time: 9-12Days

-- --
8000
Total: $
HFBR-4411Z
Broadcom(Avago)
HDWR V-LINK NUTSWASHERS 100EA ST

Lead Time: 9-12Days

-- --
5700
Total: $
HFBR-4521Z
Broadcom(Avago)
HDWR V-LINK HCS CONN/CRIMP SIMPL

Lead Time: 9-12Days

-- --
7400
Total: $
AFBR-390550RZ
Broadcom(Avago)
FIBER OPTIC RECEIVER 5MBAUD

Lead Time: 9-12Days

-- --
1700
Total: $
AFBR-390575RZ
Broadcom(Avago)
FIBER OPTIC RECEIVER 5MBAUD

MPQ: 120

Lead Time: 9-12Days

-- --
1400
Total: $
AFBR-395075RZ
Broadcom(Avago)
FIBER OPTIC RECEIVER 50MBAUD

MPQ: 120

Lead Time: 9-12Days

-- --
300
Total: $
AFBR-395000RZ
Broadcom(Avago)
FIBER OPTIC RECEIVER 50MBAUD

Lead Time: 9-12Days

-- --
9200
Total: $
HLMP-1050
Broadcom(Avago)
LED HOUSING 3MM RT ANGLE MOUNT

MPQ: 2000

Lead Time: 9-12Days

-- --
2200
Total: $
HFBR-4522Z
Broadcom(Avago)
HDWR V-LINK PORT PLUGS 1=500PC

MPQ: 1

Lead Time: 9-12Days

-- --
3500
Total: $
AFBR-390500RZ
Broadcom(Avago)
FIBER OPTIC RECEIVER 5MBAUD

Lead Time: 9-12Days

-- --
8500
Total: $
HFBR-4120Z
Broadcom(Avago)
HDWR V-LINK PLUG HFBR-0400 ST

Lead Time: 9-12Days

-- --
8800
Total: $
CIM05U601NC
Samsung
FERRITE BEAD 600 OHM 0402 1LN

Lead Time: 9-12Days

-- --
8600
Total: $
CIB10P330NC
Samsung
FERRITE BEAD 33 OHM 0603 1LN

Lead Time: 9-12Days

-- --
7600
Total: $
CIM10U800NC
Samsung
FERRITE BEAD 80 OHM 0603 1LN

Lead Time: 9-12Days

-- --
7500
Total: $
CIM05J152NC
Samsung
FERRITE BEAD 1.5 KOHM 0402 1LN

Lead Time: 9-12Days

-- --
7200
Total: $
CIC10P300NC
Samsung
FERRITE BEAD 30 OHM 0603 1LN

Lead Time: 9-12Days

-- --
9400
Total: $
CIM10J102NC
Samsung
FERRITE BEAD 1 KOHM 0603 1LN

Lead Time: 9-12Days

-- --
1900
Total: $
  • 1
  • 3542
  • 3543
  • 3544
  • 3545
  • 3546
  • 6670
Go to