Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MTFDDAK1T0MBF-1AN1ZABLA
Micron
SSD 1TB 2.5" MLC SATA III 5V

Lead Time: 9-12Days

-- --
2900
Total: $
MKP385462125JKI2B0
Vishay
CAP FILM 0.62UF 5% 1.25KVDC RAD

MPQ: 75

Lead Time: 9-12Days

-- --
8800
Total: $
MTFDDAK1T0MBF-1AN1ZABYY
Micron
SSD 1TB 2.5" MLC SATA III 5V

Lead Time: 9-12Days

-- --
1200
Total: $
MKP385462125JKP2T0
Vishay
CAP FILM 0.62UF 5% 1.25KVDC RAD

MPQ: 50

Lead Time: 9-12Days

-- --
4300
Total: $
MTFDDAK240MBB-1AE16ABYY
Micron
SSD 240GB 2.5" MLC SATA III 5V

Lead Time: 9-12Days

-- --
2300
Total: $
MKP385462125JKM2T0
Vishay
CAP FILM 0.62UF 5% 1.25KVDC RAD

MPQ: 50

Lead Time: 9-12Days

-- --
7400
Total: $
MTFDDAK240MBB-1AE1ZABYY
Micron
SSD 240GB 2.5" MLC SATA III 5V

Lead Time: 9-12Days

-- --
5300
Total: $
MKP1848590704K2
Vishay
CAP FILM 9UF 5% 700VDC RADIAL

MPQ: 65

Lead Time: 9-12Days

-- --
8000
Total: $
MKP1848560094K2
Vishay
CAP FILM 6UF 5% 900VDC RADIAL

MPQ: 65

Lead Time: 9-12Days

-- --
2100
Total: $
942C12P22K-F
Cornell Dubilier
CAP FILM 0.22UF 1.2KVDC AXIAL

Lead Time: 9-12Days

-- --
7200
Total: $
MTFDDAK240MBP-1AN16ABYY
Micron
SSD 240GB 2.5" MLC SATA III 5V

Lead Time: 9-12Days

-- --
9400
Total: $
B32656S0155K501
Tdk
CAP FILM 1.5UF 10% 1KVDC SCREW

Lead Time: 9-12Days

-- --
2500
Total: $
MTFDDAK240MBP-1AN1ZABYY
Micron
SSD 240GB 2.5" MLC SATA III 5V

Lead Time: 9-12Days

-- --
3800
Total: $
BFC237874753
Vishay
CAP FILM 0.075UF 5% 1KVDC RADIAL

MPQ: 300

Lead Time: 9-12Days

-- --
1600
Total: $
MTFDDAK256MBF-1AN12ABYY
Micron
SSD 256GB 2.5" MLC SATA III 5V

Lead Time: 9-12Days

-- --
4700
Total: $
MKP385547025JKP2T0
Vishay
CAP FILM 4.7UF 5% 250VDC RADIAL

MPQ: 100

Lead Time: 9-12Days

-- --
2400
Total: $
MTFDDAK256MBF-1AN15ABLA
Micron
SSD 256GB 2.5" MLC SATA III 5V

Lead Time: 9-12Days

-- --
9000
Total: $
MKP385547025JKM2T0
Vishay
CAP FILM 4.7UF 5% 250VDC RADIAL

MPQ: 100

Lead Time: 9-12Days

-- --
9800
Total: $
MKP385547025JKI2B0
Vishay
CAP FILM 4.7UF 5% 250VDC RADIAL

MPQ: 125

Lead Time: 9-12Days

-- --
6700
Total: $
MTFDDAK256MBF-1AN1ZABLA
Micron
SSD 256GB 2.5" MLC SATA III 5V

Lead Time: 9-12Days

-- --
3500
Total: $
  • 1
  • 3517
  • 3518
  • 3519
  • 3520
  • 3521
  • 6670
Go to