Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
C1210C563M5JACAUTO
Kemet(Yageo)
CAP CER 0.056UF 50V U2J 1210

MPQ: 4000

Lead Time: 9-12Days

-- --
600
Total: $
77313-122R08LF
Amphenol
CONN HEADER VERT 8POS 2.54MM

Lead Time: 9-12Days

-- --
8200
Total: $
C1210C182K5GACTU
Kemet(Yageo)
CAP CER 1800PF 50V C0G/NP0 1210

MPQ: 4000

Lead Time: 9-12Days

-- --
5300
Total: $
77311-146-08LF
Amphenol
CONN HEADER VERT 8POS 2.54MM

Lead Time: 9-12Days

-- --
6100
Total: $
75844-302-08LF
Amphenol
CONN HEADER VERT 8POS 2.54MM

Lead Time: 9-12Days

-- --
8500
Total: $
C0805C131G5GACTU
Kemet(Yageo)
CAP CER 130PF 50V C0G/NP0 0805

MPQ: 4000

Lead Time: 9-12Days

-- --
9000
Total: $
MTFDDAV512TDL-1AW15ABHA
Micron
SSD 512GB M.2 MOD TLC SATA III

Lead Time: 9-12Days

-- --
1500
Total: $
C0805C124J5RACTU
Kemet(Yageo)
CAP CER 0.12UF 50V X7R 0805

MPQ: 4000

Lead Time: 9-12Days

-- --
2700
Total: $
75867-232LF
Amphenol
CONN HEADER R/A 8POS 2.54MM

Lead Time: 9-12Days

-- --
2100
Total: $
MTFDHBA512TCK-1AS1AABFA
Micron
SSD 512GB M.2 MODULE TLC NVME

Lead Time: 9-12Days

-- --
7300
Total: $
C0805C124J3RACTU
Kemet(Yageo)
CAP CER 0.12UF 25V X7R 0805

MPQ: 4000

Lead Time: 9-12Days

-- --
9300
Total: $
MTFDHBA512TCK-1AS1AABGA
Micron
SSD 512GB M.2 MODULE TLC NVME

Lead Time: 9-12Days

-- --
5300
Total: $
MTFDHBA512TCK-1AS1AABHA
Micron
SSD 512GB M.2 MODULE TLC NVME

Lead Time: 9-12Days

-- --
9500
Total: $
C0805C111G5GACTU
Kemet(Yageo)
CAP CER 110PF 50V C0G/NP0 0805

MPQ: 4000

Lead Time: 9-12Days

-- --
6000
Total: $
MTFDHBA512TCK-1AS1AABLA
Micron
SSD 512GB M.2 MODULE TLC NVME

Lead Time: 9-12Days

-- --
2800
Total: $
12065A1R5BAT2A
Kyocera Avx Components
CAP CER 1.5PF 50V C0G/NP0 1206

MPQ: 4000

Lead Time: 9-12Days

-- --
6200
Total: $
MTFDHBA512TCK-2AS1AABDA
Micron
SSD 512GB M.2 MODULE TLC NVME

Lead Time: 9-12Days

-- --
1800
Total: $
MTFDHBA512TCK-1AS15ABFA
Micron
SSD 512GB M.2 MODULE TLC NVME

Lead Time: 9-12Days

-- --
3200
Total: $
12065A1R2BAT2A
Kyocera Avx Components
CAP CER 1.2PF 50V C0G/NP0 1206

MPQ: 4000

Lead Time: 9-12Days

-- --
5800
Total: $
2304-6121-TB
3M
CONN HEADER VERT 4POS 2.54MM

Lead Time: 9-12Days

-- --
4700
Total: $
  • 1
  • 3490
  • 3491
  • 3492
  • 3493
  • 3494
  • 6670
Go to