Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MT9JSF51272AZ-1G9P1
Micron
MODULE DDR3 SDRAM 4GB 240UDIMM

Lead Time: 9-12Days

-- --
7600
Total: $
HMTSW-106-08-T-S-295
Samtec
CONN HEADER VERT 6POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
4400
Total: $
MTA16ATF2G64AZ-2G1A1
Micron
MODULE DDR4 SDRAM 16GB 288UDIMM

Lead Time: 9-12Days

-- --
100
Total: $
HMTSW-106-08-T-S-280
Samtec
CONN HEADER VERT 6POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
6000
Total: $
MTA16ATF2G64AZ-2G3B1
Micron
MODULE DDR4 SDRAM 16GB 288UDIMM

Lead Time: 9-12Days

-- --
3500
Total: $
MTA16ATF2G64AZ-2G6B1
Micron
MODULE DDR4 SDRAM 16GB 288UDIMM

Lead Time: 9-12Days

-- --
6000
Total: $
MTA16ATF2G64HZ-2G1A1
Micron
MODULE DDR4 SDRAM 16GB 260SODIMM

Lead Time: 9-12Days

-- --
9500
Total: $
HMTSW-106-08-T-S-195
Samtec
CONN HEADER VERT 6POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
9600
Total: $
MTA16ATF2G64HZ-2G1B1
Micron
MODULE DDR4 SDRAM 16GB 260SODIMM

Lead Time: 9-12Days

-- --
3200
Total: $
MTA16ATF2G64HZ-2G3A1
Micron
MODULE DDR4 SDRAM 16GB 260SODIMM

Lead Time: 9-12Days

-- --
5300
Total: $
MTSW-105-10-T-S-530-RA
Samtec
CONN HEADER R/A 5POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
9900
Total: $
HTSW-104-07-TM-S-LL
Samtec
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
2800
Total: $
MTA16ATF2G64HZ-2G3B1
Micron
MODULE DDR4 SDRAM 16GB 260SODIMM

Lead Time: 9-12Days

-- --
4400
Total: $
MTA16ATF2G64HZ-2G6B1
Micron
MODULE DDR4 SDRAM 16GB 260SODIMM

Lead Time: 9-12Days

-- --
8300
Total: $
HTSW-104-07-T-S-LL
Samtec
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
8100
Total: $
MTA18ADF2G72PZ-2G3A1
Micron
MODULE DDR4 SDRAM 16GB 288RDIMM

Lead Time: 9-12Days

-- --
8200
Total: $
MTA18ADF2G72PZ-2G3B1
Micron
MODULE DDR4 SDRAM 16GB 288RDIMM

Lead Time: 9-12Days

-- --
4400
Total: $
MTA18ASF1G72AZ-2G1B1
Micron
MODULE DDR4 SDRAM 8GB 288UDIMM

Lead Time: 9-12Days

-- --
4300
Total: $
HTSW-101-07-G-D-LL
Samtec
CONN HEADER VERT 2POS

MPQ: 1

Lead Time: 9-12Days

-- --
9500
Total: $
MTA18ASF1G72AZ-2G6B1
Micron
MODULE DDR4 SDRAM 8GB 288UDIMM

Lead Time: 9-12Days

-- --
6000
Total: $
  • 1
  • 3474
  • 3475
  • 3476
  • 3477
  • 3478
  • 6670
Go to