Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MKP1848550914P2
Vishay
CAP FILM 5UF 5% 1.1KVDC RADIAL

Lead Time: 9-12Days

-- --
600
Total: $
MT4LSDT1664AY-133D1
Micron
MODULE SDRAM 128MB 168UDIMM

Lead Time: 9-12Days

-- --
9800
Total: $
MT4LSDT1664HG-133D1
Micron
MODULE SDRAM 128MB 144SODIMM

Lead Time: 9-12Days

-- --
6700
Total: $
BFC237351125
Vishay
CAP FILM 1.2UF 10% 400VDC RADIAL

MPQ: 100

Lead Time: 9-12Days

-- --
7800
Total: $
MT4LSDT1664HG-13ED1
Micron
MODULE SDRAM 128MB 144SODIMM

Lead Time: 9-12Days

-- --
800
Total: $
BFC238371273
Vishay
CAP FILM 0.027UF 5% 2.5KVDC RAD

MPQ: 200

Lead Time: 9-12Days

-- --
7000
Total: $
BFC238370273
Vishay
CAP FILM 0.027UF 5% 2.5KVDC RAD

MPQ: 100

Lead Time: 9-12Days

-- --
2500
Total: $
MT4LSDT464HG-133G4
Micron
MODULE SDRAM 32MB 144SODIMM

MPQ: 100

Lead Time: 9-12Days

-- --
8400
Total: $
MT4LSDT864HG-133G2
Micron
MODULE SDRAM 64MB 144SODIMM

Lead Time: 9-12Days

-- --
2600
Total: $
MT4LSDT864HG-13EG2
Micron
MODULE SDRAM 64MB 144SODIMM

Lead Time: 9-12Days

-- --
3200
Total: $
MKP1848C55010JP2
Vishay
CAP FILM 5UF 5% 1KVDC RADIAL

MPQ: 105

Lead Time: 9-12Days

-- --
0
Total: $
761M22556C
Cornell Dubilier
CAP FILM 2.2UF 5% 630VDC AXIAL

Lead Time: 9-12Days

-- --
1400
Total: $
MKP385536040JKP2T0
Vishay
CAP FILM 3.6UF 5% 400VDC RADIAL

MPQ: 50

Lead Time: 9-12Days

-- --
4700
Total: $
MKP385536040JKM2T0
Vishay
CAP FILM 3.6UF 5% 400VDC RADIAL

MPQ: 50

Lead Time: 9-12Days

-- --
8000
Total: $
MKP385536040JKI2B0
Vishay
CAP FILM 3.6UF 5% 400VDC RADIAL

MPQ: 75

Lead Time: 9-12Days

-- --
5700
Total: $
BFC247990143
Vishay
CAP FILM 1.3UF 5% 250VDC RADIAL

MPQ: 400

Lead Time: 9-12Days

-- --
5500
Total: $
BFC238314824
Vishay
CAP FILM 0.82UF 5% 400VDC RADIAL

MPQ: 250

Lead Time: 9-12Days

-- --
9600
Total: $
MKT-A 8,2 UF/250V.
Visaton
CAP FILM 8.2UF 5% 250VDC AXIAL

MPQ: 10

Lead Time: 9-12Days

-- --
9800
Total: $
MKP1848610704K2
Vishay
CAP FILM 10UF 5% 700VDC RADIAL

MPQ: 65

Lead Time: 9-12Days

-- --
5000
Total: $
MKP1848590454K2
Vishay
CAP FILM 9UF 5% 450VDC RADIAL

MPQ: 80

Lead Time: 9-12Days

-- --
6600
Total: $
  • 1
  • 3437
  • 3438
  • 3439
  • 3440
  • 3441
  • 6670
Go to