Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MKP385439160JKM2T0
Vishay
CAP FILM 0.39UF 5% 1.6KVDC RAD

MPQ: 50

Lead Time: 9-12Days

-- --
200
Total: $
MTA36ASF4G72PZ-2G9E6
Micron
MODULE DDR4 SDRAM 32GB 288RDIMM

Lead Time: 9-12Days

-- --
5100
Total: $
MTA18ASF4G72HZ-2G6B1
Micron
MODULE DDR4 SDRAM 32GB 260SODIMM

Lead Time: 9-12Days

-- --
2100
Total: $
BFC233914275
Vishay
CAP FILM 2.7UF 10% 630VDC RADIAL

MPQ: 100

Lead Time: 9-12Days

-- --
8200
Total: $
BFC233912275
Vishay
CAP FILM 2.7UF 10% 630VDC RADIAL

MPQ: 100

Lead Time: 9-12Days

-- --
3300
Total: $
MTA18ASF4G72PDZ-2G9B2
Micron
MODULE DDR4 SDRAM 32GB 288RDIMM

Lead Time: 9-12Days

-- --
5900
Total: $
BFC233910275
Vishay
CAP FILM 2.7UF 10% 630VDC RADIAL

MPQ: 100

Lead Time: 9-12Days

-- --
4400
Total: $
930C4W2P7K-F
Cornell Dubilier
CAP FILM 2.7UF 10% 400VDC AXIAL

Lead Time: 9-12Days

-- --
7200
Total: $
MTA36ASF4G72PZ-2G6E4
Micron
MODULE DDR4 SDRAM 32GB 288RDIMM

Lead Time: 9-12Days

-- --
300
Total: $
MTA18ADF4G72AZ-2G6B2
Micron
MODULE DDR4 SDRAM 32GB 288UDIMM

Lead Time: 9-12Days

-- --
9400
Total: $
930C2W4K-F
Cornell Dubilier
CAP FILM 4UF 10% 250VDC AXIAL

Lead Time: 9-12Days

-- --
5900
Total: $
MTA18ASF4G72AZ-2G6B1
Micron
MODULE DDR4 SDRAM 32GB 288UDIMM

Lead Time: 9-12Days

-- --
1000
Total: $
MTA18ASF4G72PDZ-3G2B2
Micron
MODULE DDR4 SDRAM 32GB 288RDIMM

Lead Time: 9-12Days

-- --
6900
Total: $
EEC2G405HWNM06
Nichicon
CAP FILM 4UF -5% +10% 400VAC RAD

Lead Time: 9-12Days

-- --
0
Total: $
MTA18ADF4G72PZ-3G2B2
Micron
MODULE DDR4 SDRAM 32GB 288RDIMM

Lead Time: 9-12Days

-- --
8300
Total: $
BFC247990144
Vishay
CAP FILM 1.5UF 5% 250VDC RADIAL

MPQ: 400

Lead Time: 9-12Days

-- --
100
Total: $
MTA18ASF4G72HZ-3G2B1
Micron
MODULE DDR4 SDRAM 32GB 260SODIMM

Lead Time: 9-12Days

-- --
6700
Total: $
MKP1847570274K2
Vishay
CAP FILM 7UF 5% 275VAC RADIAL

MPQ: 70

Lead Time: 9-12Days

-- --
1900
Total: $
BFC230343275
Vishay
CAP FILM 2.7UF 10% 250VDC RADIAL

Lead Time: 9-12Days

-- --
8100
Total: $
B32656J2224J000
Tdk
CAP FILM 5% 2KVDC RADIAL

MPQ: 640

Lead Time: 9-12Days

-- --
9400
Total: $
  • 1
  • 3418
  • 3419
  • 3420
  • 3421
  • 3422
  • 6670
Go to