Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
2SK1070PIETR-E
Renesas
JFET N-CH 22V 50MA 3MPAK

Lead Time: 9-12Days

-- --
6400
Total: $
GA1812Y123KBEAR31G
Vishay
CAP CER 0.012UF 500V X7R 1812

MPQ: 4000

Lead Time: 9-12Days

-- --
7000
Total: $
5285-MMBFJ201
Onsemi
JFET N-CH 40V SOT23-3

Lead Time: 9-12Days

-- --
700
Total: $
GA1812Y103MBLAR31G
Vishay
CAP CER 10000PF 630V X7R 1812

MPQ: 4000

Lead Time: 9-12Days

-- --
7800
Total: $
J109,126
Nxp Semiconductors
JFET N-CH 25V TO92-3

Lead Time: 9-12Days

-- --
1300
Total: $
GA1812Y103MBEAR31G
Vishay
CAP CER 10000PF 500V X7R 1812

MPQ: 4000

Lead Time: 9-12Days

-- --
9100
Total: $
GA1812Y103KBLAR31G
Vishay
CAP CER 10000PF 630V X7R 1812

MPQ: 4000

Lead Time: 9-12Days

-- --
900
Total: $
J174,126
Nxp Semiconductors
JFET P-CH 30V TO92-3

Lead Time: 9-12Days

-- --
5600
Total: $
GA1812Y103KBEAR31G
Vishay
CAP CER 10000PF 500V X7R 1812

MPQ: 4000

Lead Time: 9-12Days

-- --
7000
Total: $
J176,126
Nxp Semiconductors
JFET P-CH 30V TO92-3

Lead Time: 9-12Days

-- --
2600
Total: $
C1210C823M5JAC7800
Kemet(Yageo)
CAP CER 0.082UF 50V U2J 1210

MPQ: 4000

Lead Time: 9-12Days

-- --
6700
Total: $
J108,126
Nxp Semiconductors
JFET N-CH 25V TO92-3

Lead Time: 9-12Days

-- --
400
Total: $
SR212C223KARTR2-85
Kyocera Avx Components
CAP CER RADIAL

Lead Time: 9-12Days

-- --
8400
Total: $
J110,126
Nxp Semiconductors
JFET N-CH 25V TO92-3

Lead Time: 9-12Days

-- --
3500
Total: $
SR892A220JARTR1
Kyocera Avx Components
CAP CER 22PF 200V NP0 RADIAL

Lead Time: 9-12Days

-- --
3400
Total: $
SR592C223KARTR1
Kyocera Avx Components
CAP CER 0.022UF 200V X7R RADIAL

Lead Time: 9-12Days

-- --
1700
Total: $
C0805C472J5GALTU
Kemet(Yageo)
CAP CER 4700PF 50V NP0 0805

MPQ: 2500

Lead Time: 9-12Days

-- --
6900
Total: $
GRT31C5C1H683JA02L
Murata
CAP CER 0.068UF 50V C0G/NP0 1206

MPQ: 2000

Lead Time: 9-12Days

-- --
9600
Total: $
LD06YC274KAB2A
Kyocera Avx Components
CAP CER SMD

Lead Time: 9-12Days

-- --
300
Total: $
12063A123JAT2A
Kyocera Avx Components
CAP CER 0.012UF 25V C0G/NP0 1206

MPQ: 4000

Lead Time: 9-12Days

-- --
300
Total: $
  • 1
  • 3410
  • 3411
  • 3412
  • 3413
  • 3414
  • 6670
Go to