Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
FRC1206F2204TS
Fojan
250mW 2.2MΩ ±1% 1206

Lead Time: 9-12Days

-- --
2300
Total: $
FRC1206J304 TS
Fojan
250mW 300kΩ ±5% 1206

Lead Time: 9-12Days

-- --
2900
Total: $
FRL1812FR100TS
Fojan

Lead Time: 9-12Days

-- --
1900
Total: $
FRL2512FR100TS
Fojan
1W 100mΩ ±1% 2512

Lead Time: 9-12Days

-- --
2100
Total: $
FRL1206FR300TS
Fojan
250mW 300mΩ ±1% 1206

Lead Time: 9-12Days

-- --
7900
Total: $
FRC2512J121 TS
Fojan
1W 120Ω ±5% 2512

Lead Time: 9-12Days

-- --
3300
Total: $
FRC2512J104 TS
Fojan
2512 100KΩ ±5% 1W

Lead Time: 9-12Days

-- --
3900
Total: $
FRL0402FR500TS
Fojan
62.5mW 500mΩ ±1% 0402

Lead Time: 9-12Days

-- --
5700
Total: $
FRC0805J273 TS
Fojan
0805 27KΩ ±5% 1/8W

Lead Time: 9-12Days

-- --
6300
Total: $
FRC0805J162 TS
Fojan
0805 1.6KΩ ±5% 1/8W

Lead Time: 9-12Days

-- --
6700
Total: $
FRC1206F49R9TS
Fojan
250mW 49.9Ω ±1% 1206

Lead Time: 9-12Days

-- --
6900
Total: $
FRC1206F1802TS
Fojan
250mW 18kΩ ±1% 1206

Lead Time: 9-12Days

-- --
7900
Total: $
FRC1206F5R60TS
Fojan
250mW 5.6Ω ±1% 1206

Lead Time: 9-12Days

-- --
8900
Total: $
FRC1206F8201TS
Fojan
250mW 8.2kΩ ±1% 1206

Lead Time: 9-12Days

-- --
100
Total: $
FRC1206J180 TS
Fojan

Lead Time: 9-12Days

-- --
300
Total: $
FRC0603J8R2 TS
Fojan
100mW 8.2Ω ±5% 0603

Lead Time: 9-12Days

-- --
700
Total: $
FRC0805F5603TS
Fojan
125mW 560kΩ ±1% 0805

Lead Time: 9-12Days

-- --
100
Total: $
FRC0805J220 TS
Fojan
125mW 22Ω ±5% 0805

Lead Time: 9-12Days

-- --
1300
Total: $
FRC0805J393 TS
Fojan
125mW 39kΩ ±5% 0805

Lead Time: 9-12Days

-- --
8100
Total: $
FRC0805J681 TS
Fojan
125mW 680Ω ±5% 0805

Lead Time: 9-12Days

-- --
8500
Total: $
  • 1
  • 32
  • 33
  • 34
  • 35
  • 36
  • 6854
Go to