Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
SIGC14T60NCX1SA2
Infineon
IGBT 3 CHIP 600V WAFER

Lead Time: 9-12Days

-- --
2900
Total: $
SIGC121T60NR2CX1SA3
Infineon
IGBT 3 CHIP 600V WAFER

Lead Time: 9-12Days

-- --
7500
Total: $
1206Y0160681MXT
Knowles
CAP CER 680PF 16V X7R 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
7100
Total: $
SIGC81T60NCX1SA5
Infineon
IGBT 3 CHIP 600V WAFER

Lead Time: 9-12Days

-- --
9900
Total: $
B32676G1685K000
Tdk
CAP FILM 6.8UF 10% 750VDC RADIAL

MPQ: 440

Lead Time: 9-12Days

-- --
700
Total: $
SIGC42T60UNX1SA1
Infineon
IGBT 3 CHIP 600V WAFER

Lead Time: 9-12Days

-- --
6300
Total: $
SIGC42T60NCX1SA5
Infineon
IGBT 3 CHIP 600V WAFER

Lead Time: 9-12Days

-- --
4400
Total: $
761M25556C
Cornell Dubilier
CAP FILM 2.5UF 5% 630VDC AXIAL

Lead Time: 9-12Days

-- --
9400
Total: $
SIGC42T60SNCX1SA2
Infineon
IGBT 3 CHIP 600V WAFER

Lead Time: 9-12Days

-- --
4100
Total: $
SIGC12T60NCX1SA4
Infineon
IGBT 3 CHIP 600V WAFER

Lead Time: 9-12Days

-- --
8100
Total: $
1206Y0160562MXT
Knowles
CAP CER 5600PF 16V X7R 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
3700
Total: $
SIGC18T60SNCX1SA2
Infineon
IGBT 3 CHIP 600V WAFER

Lead Time: 9-12Days

-- --
6700
Total: $
1206Y0160472MXT
Knowles
CAP CER 4700PF 16V X7R 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
8600
Total: $
683PSB302K2J
Cornell Dubilier
CAP FILM 0.068UF 10% 3KVDC RAD

Lead Time: 9-12Days

-- --
8100
Total: $
SIGC18T60NCX7SA2
Infineon
IGBT 3 CHIP 600V WAFER

Lead Time: 9-12Days

-- --
3700
Total: $
1206Y0160392MXT
Knowles
CAP CER 3900PF 16V X7R 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
3000
Total: $
SIGC14T60NCX7SA1
Infineon
IGBT 3 CHIP 600V WAFER

Lead Time: 9-12Days

-- --
5200
Total: $
SIGC18T60NCX1SA3
Infineon
IGBT 3 CHIP 600V WAFER

Lead Time: 9-12Days

-- --
2500
Total: $
683PSB302K2H
Cornell Dubilier
CAP FILM 0.068UF 10% 3KVDC RAD

Lead Time: 9-12Days

-- --
8100
Total: $
SIGC14T60SNCX1SA3
Infineon
IGBT 3 CHIP 600V WAFER

Lead Time: 9-12Days

-- --
6100
Total: $
  • 1
  • 3385
  • 3386
  • 3387
  • 3388
  • 3389
  • 6670
Go to