Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MKP385562016JKI2B0
Vishay
CAP FILM 6.2UF 5% 160VDC RADIAL

MPQ: 100

Lead Time: 9-12Days

-- --
400
Total: $
AUIRG4PH50S-205
Infineon
IGBT 1200V TO247-3

Lead Time: 9-12Days

-- --
8500
Total: $
AUXKNG4PH50S-215
Infineon
IGBT 1200V TO247-3

Lead Time: 9-12Days

-- --
500
Total: $
RJP4009ANS-01#Q5
Renesas
IGBT 400V 8VSON

Lead Time: 9-12Days

-- --
6000
Total: $
BFC237353155
Vishay
CAP FILM 1.5UF 10% 400VDC RADIAL

MPQ: 100

Lead Time: 9-12Days

-- --
2300
Total: $
IRGC14C40LD
Infineon
IGBT IGNITION LL

Lead Time: 9-12Days

-- --
700
Total: $
BFC237351155
Vishay
CAP FILM 1.5UF 10% 400VDC RADIAL

MPQ: 100

Lead Time: 9-12Days

-- --
8400
Total: $
IRG4RC10SDTRPBFBTMA1
Infineon
IGBT 600V 14A 38W DPAK

Lead Time: 9-12Days

-- --
1700
Total: $
MPX226K305R
Cornell Dubilier
CAP FILM 22UF 10% 305VAC RADIAL

Lead Time: 9-12Days

-- --
3700
Total: $
RJH60T04DPQ-A0#T0
Renesas
IGBT TH

Lead Time: 9-12Days

-- --
7100
Total: $
MKP385568025JKP2T0
Vishay
CAP FILM 6.8UF 5% 250VDC RADIAL

MPQ: 100

Lead Time: 9-12Days

-- --
1700
Total: $
RJP65T54DPM-E0#T2
Renesas
IGBT TRENCH TO-3FP

Lead Time: 9-12Days

-- --
3200
Total: $
MKP385568025JKM2T0
Vishay
CAP FILM 6.8UF 5% 250VDC RADIAL

MPQ: 100

Lead Time: 9-12Days

-- --
2800
Total: $
AIKW75N60CTE8188XKSA1
Infineon
IGBT 600V TO247-3

Lead Time: 9-12Days

-- --
9300
Total: $
MKP385568025JKI2B0
Vishay
CAP FILM 6.8UF 5% 250VDC RADIAL

MPQ: 100

Lead Time: 9-12Days

-- --
1900
Total: $
63-7000PBF
Infineon
IGBT 650V COPAK

Lead Time: 9-12Days

-- --
9300
Total: $
MKP1848C57010JP4
Vishay
CAP FILM 7UF 5% 1KVDC RADIAL

MPQ: 105

Lead Time: 9-12Days

-- --
6400
Total: $
IGC70T120T8RQX1SA1
Infineon
IGBT CHIP

Lead Time: 9-12Days

-- --
8600
Total: $
MKP1848C55012JP4
Vishay
CAP FILM 5UF 5% 1.2KVDC RADIAL

MPQ: 105

Lead Time: 9-12Days

-- --
1200
Total: $
IGC54T65R3QEX1SA1
Infineon
IGBT CHIP

Lead Time: 9-12Days

-- --
8600
Total: $
  • 1
  • 3375
  • 3376
  • 3377
  • 3378
  • 3379
  • 6670
Go to