Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MKP383418200JPI2T0
Vishay
CAP FILM 0.18UF 5% 2KVDC RADIAL

MPQ: 105

Lead Time: 9-12Days

-- --
2500
Total: $
IRGP4269D-EPBF
Infineon
IGBT 600V TO247 COPAK

Lead Time: 9-12Days

-- --
9300
Total: $
BFC230344275
Vishay
CAP FILM 2.7UF 5% 250VDC RADIAL

Lead Time: 9-12Days

-- --
4700
Total: $
IRGP4269DPBF
Infineon
IGBT 600V TO247 COPAK

Lead Time: 9-12Days

-- --
3000
Total: $
B32776E0126K000
Tdk
CAP FILM 12UF 10% 1.1KVDC RADIAL

MPQ: 640

Lead Time: 9-12Days

-- --
1100
Total: $
BFC238341823
Vishay
CAP FILM 0.082UF 5% 1.4KVDC RAD

MPQ: 200

Lead Time: 9-12Days

-- --
1200
Total: $
IRGS4062DTRLPBF
Infineon
IGBT DISCRETES

Lead Time: 9-12Days

-- --
6300
Total: $
BFC238334184
Vishay
CAP FILM 0.18UF 5% 1KVDC RADIAL

MPQ: 125

Lead Time: 9-12Days

-- --
3100
Total: $
RJH60T04DPQ-A1#T0
Renesas
IGBT TRENCH 600V 60A TO247A

MPQ: 25

Lead Time: 9-12Days

-- --
3800
Total: $
BFC238331184
Vishay
CAP FILM 0.18UF 5% 1KVDC RADIAL

MPQ: 200

Lead Time: 9-12Days

-- --
6900
Total: $
RJH65T04BDPMA0#T2F
Renesas
IGBT TRENCH 650V 60A TO3PFP

Lead Time: 9-12Days

-- --
900
Total: $
BFC238330184
Vishay
CAP FILM 0.18UF 5% 1KVDC RADIAL

MPQ: 100

Lead Time: 9-12Days

-- --
5800
Total: $
RJH65T46DPQ-A0#T0
Renesas
IGBT TRENCH 650V 80A TO247A

MPQ: 25

Lead Time: 9-12Days

-- --
4000
Total: $
RJH65T47DPQ-A0#T0
Renesas
IGBT TRENCH 650V 90A TO247A

Lead Time: 9-12Days

-- --
2500
Total: $
RJP65T54DPM-A0#T2
Renesas
IGBT TRENCH 650V 60A TO3PFP

MPQ: 25

Lead Time: 9-12Days

-- --
2100
Total: $
NGTB25N120FL2WAG
Onsemi
IGBT FIELD STOP 1.2KV TO247-4

Lead Time: 9-12Days

-- --
9100
Total: $
NGTB40N65IHRWG
Onsemi
IGBT FIELD STOP 650V 80A TO247

Lead Time: 9-12Days

-- --
9200
Total: $
NGTB50N65FL2WAG
Onsemi
IGBT FIELD STOP 650V 160A TO247

Lead Time: 9-12Days

-- --
9600
Total: $
NGTB50N65S1WG
Onsemi
IGBT TRENCH 650V 140A TO247

Lead Time: 9-12Days

-- --
7700
Total: $
NGTB75N65FL2WAG
Onsemi
IGBT FIELD STOP 650V 200A TO247

Lead Time: 9-12Days

-- --
3600
Total: $
  • 1
  • 3373
  • 3374
  • 3375
  • 3376
  • 3377
  • 6670
Go to