Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
IRGS4607DTRLPBF
Infineon
IGBT 600V 11A D2PAK

Lead Time: 9-12Days

-- --
8700
Total: $
MKP383420200JPP2T0
Vishay
CAP FILM 0.2UF 5% 2KVDC RADIAL

MPQ: 105

Lead Time: 9-12Days

-- --
2800
Total: $
IRGS4610DTRLPBF
Infineon
IGBT 600V 16A 77W D2PAK

Lead Time: 9-12Days

-- --
7100
Total: $
MKP383420200JPM2T0
Vishay
CAP FILM 0.2UF 5% 2KVDC RADIAL

MPQ: 105

Lead Time: 9-12Days

-- --
4700
Total: $
IRGS4610DTRRPBF
Infineon
IGBT 600V 16A 77W D2PAK

Lead Time: 9-12Days

-- --
4300
Total: $
MKP383420200JPI2T0
Vishay
CAP FILM 0.2UF 5% 2KVDC RADIAL

MPQ: 105

Lead Time: 9-12Days

-- --
7400
Total: $
224PPB202K
Cornell Dubilier
CAP FILM 0.22UF 10% 2KVDC RADIAL

Lead Time: 9-12Days

-- --
1500
Total: $
IRGS4620DTRRPBF
Infineon
IGBT 600V 32A 140W D2PAK

Lead Time: 9-12Days

-- --
5800
Total: $
BFC238311754
Vishay
CAP FILM 0.75UF 5% 400VDC RADIAL

MPQ: 200

Lead Time: 9-12Days

-- --
6100
Total: $
IRGS4630DTRLPBF
Infineon
IGBT 600V 47A 206W D2PAK

Lead Time: 9-12Days

-- --
8900
Total: $
BFC238310754
Vishay
CAP FILM 0.75UF 5% 400VDC RADIAL

MPQ: 200

Lead Time: 9-12Days

-- --
6100
Total: $
IRGS4630DTRRPBF
Infineon
IGBT 600V 47A 206W D2PAK

Lead Time: 9-12Days

-- --
8800
Total: $
IRG7PH35U-EP
Infineon
IGBT TRENCH 1200V 55A TO247AD

Lead Time: 9-12Days

-- --
1700
Total: $
IRG7PH46UD-EP
Infineon
IGBT 1200V 108A COPAK247

Lead Time: 9-12Days

-- --
900
Total: $
MKP1841547255
Vishay
CAP FILM 4.7UF 10% 250VDC RADIAL

MPQ: 56

Lead Time: 9-12Days

-- --
3500
Total: $
BFC247942155
Vishay
CAP FILM 1.5UF 5% 250VDC RADIAL

MPQ: 450

Lead Time: 9-12Days

-- --
800
Total: $
MKP1841547165
Vishay
CAP FILM 4.7UF 10% 160VDC RADIAL

MPQ: 60

Lead Time: 9-12Days

-- --
8700
Total: $
MKP1839522634HQR
Vishay
CAP FILM 2.2UF 5% 630VDC AXIAL

MPQ: 200

Lead Time: 9-12Days

-- --
8200
Total: $
TIG056BF-1E
Onsemi
IGBT 430V TO220F-3FS

Lead Time: 9-12Days

-- --
5100
Total: $
MKP1848S62010JY6B
Vishay
CAP FILM 20UF 5% 1KVDC RADIAL

Lead Time: 9-12Days

-- --
9200
Total: $
  • 1
  • 3366
  • 3367
  • 3368
  • 3369
  • 3370
  • 6670
Go to