Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
RJP60F0DPM-00#T1
Renesas
IGBT 600V 50A 40W TO-3PFM

Lead Time: 9-12Days

-- --
2200
Total: $
RJH60M2DPE-00#J3
Renesas
IGBT 600V 25A 63W LDPAK

Lead Time: 9-12Days

-- --
1400
Total: $
MKT1820618165
Vishay
CAP FILM 18UF 10% 160VDC RADIAL

MPQ: 100

Lead Time: 9-12Days

-- --
2600
Total: $
RJH60V2BDPE-00#J3
Renesas
IGBT 600V 25A 63W LDPAK

Lead Time: 9-12Days

-- --
4900
Total: $
RJH60V3BDPE-00#J3
Renesas
IGBT 600V 35A 113W LDPAK

Lead Time: 9-12Days

-- --
6400
Total: $
RJH60A85RDPE-00#J3
Renesas
IGBT 600V 30A 113W LDPAK

Lead Time: 9-12Days

-- --
1600
Total: $
RJH60M2DPP-M0#T2
Renesas
IGBT TRENCH 600V 25A TO220FL

Lead Time: 9-12Days

-- --
7000
Total: $
RJH60M3DPP-M0#T2
Renesas
IGBT 600V 35A 39.7W TO-220FL

Lead Time: 9-12Days

-- --
1700
Total: $
158X225
Cornell Dubilier
CAP FILM 2.2UF 20% 275VAC RADIAL

MPQ: 1000

Lead Time: 9-12Days

-- --
8600
Total: $
B32756G3156K000
Tdk
CAP FILM 15UF 10% 580VDC RADIAL

MPQ: 400

Lead Time: 9-12Days

-- --
6000
Total: $
RJH60F0DPQ-A0#T0
Renesas
IGBT TRENCH 600V 50A TO247A

Lead Time: 9-12Days

-- --
6500
Total: $
RJH60F5BDPQ-A0#T0
Renesas
IGBT TRENCH 600V 80A TO247A

Lead Time: 9-12Days

-- --
2200
Total: $
RJH60D6DPM-00#T1
Renesas
IGBT TRENCH 600V 80A TO3PFM

Lead Time: 9-12Days

-- --
7600
Total: $
RJH60F6DPK-00#T0
Renesas
IGBT TRENCH 600V 85A TO3P

Lead Time: 9-12Days

-- --
4100
Total: $
RJH60F7ADPK-00#T0
Renesas
IGBT TRENCH 600V 90A TO3P

Lead Time: 9-12Days

-- --
7800
Total: $
RJH60F7BDPQ-A0#T0
Renesas
IGBT TRENCH 600V 90A TO247A

Lead Time: 9-12Days

-- --
7600
Total: $
BFC247962334
Vishay
CAP FILM 0.33UF 5% 630VDC RADIAL

MPQ: 550

Lead Time: 9-12Days

-- --
5900
Total: $
IRG4PC50UD-MP
Infineon
IGBT 600V 55A 200W TO247AC

Lead Time: 9-12Days

-- --
500
Total: $
MKP1848C58010JP4
Vishay
CAP FILM 8UF 5% 1KVDC RADIAL

MPQ: 105

Lead Time: 9-12Days

-- --
7400
Total: $
IRG7PH28UD1PBF
Infineon
IGBT 1200V 30A 115W TO247AC

Lead Time: 9-12Days

-- --
900
Total: $
  • 1
  • 3362
  • 3363
  • 3364
  • 3365
  • 3366
  • 6670
Go to