Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
AUIRGSL4062D1
Infineon
IGBT TRENCH 600V 59A TO-262

Lead Time: 9-12Days

-- --
500
Total: $
MKP1848C61080JP2
Vishay
CAP FILM 10UF 5% 800VDC RADIAL

Lead Time: 9-12Days

-- --
8100
Total: $
AUIRGS4062D1TRL
Infineon
IGBT 600V 59A 246W D2PAK

Lead Time: 9-12Days

-- --
5100
Total: $
MKP1848C61060JP2
Vishay
CAP FILM 10UF 5% 600VDC RADIAL

MPQ: 105

Lead Time: 9-12Days

-- --
3900
Total: $
IRGS4045DTRRPBF
Infineon
IGBT 600V 12A 77W D2PAK

Lead Time: 9-12Days

-- --
7700
Total: $
IRGS4045DTRLPBF
Infineon
IGBT 600V 12A 77W D2PAK

Lead Time: 9-12Days

-- --
9200
Total: $
MKP1848C56012JP4
Vishay
CAP FILM 6UF 5% 1.2KVDC RADIAL

MPQ: 105

Lead Time: 9-12Days

-- --
600
Total: $
IRGP4263-EPBF
Infineon
IGBT 650V 90A 300W TO-247

Lead Time: 9-12Days

-- --
5000
Total: $
IRGP4063D1PBF
Infineon
IGBT 600V 100A 330W TO247AC

Lead Time: 9-12Days

-- --
8200
Total: $
RJH60F3DPK-00#T0
Renesas
IGBT TRENCH 600V 40A TO3P

Lead Time: 9-12Days

-- --
8600
Total: $
BFC247944165
Vishay
CAP FILM 1.6UF 5% 250VDC RADIAL

MPQ: 450

Lead Time: 9-12Days

-- --
5200
Total: $
RJH60F4DPK-00#T0
Renesas
IGBT TRENCH 600V 60A TO3P

Lead Time: 9-12Days

-- --
5000
Total: $
BFC247942165
Vishay
CAP FILM 1.6UF 5% 250VDC RADIAL

MPQ: 450

Lead Time: 9-12Days

-- --
6300
Total: $
RJH60D2DPE-00#J3
Renesas
IGBT TRENCH 600V 25A LDPAK

Lead Time: 9-12Days

-- --
4400
Total: $
MKP1839568164
Vishay
CAP FILM 6.8UF 5% 160VDC AXIAL

MPQ: 500

Lead Time: 9-12Days

-- --
6300
Total: $
RJP60F5DPM-00#T1
Renesas
IGBT TRENCH 600V 80A TO3PFM

MPQ: 100

Lead Time: 9-12Days

-- --
2800
Total: $
RJP60D0DPM-00#T1
Renesas
IGBT 600V 45A TO3PFM

Lead Time: 9-12Days

-- --
1800
Total: $
B32756G7156J000
Tdk
CAP FILM 15UF 5% 550VDC RADIAL

MPQ: 440

Lead Time: 9-12Days

-- --
5500
Total: $
RJH1CV5DPK-00#T0
Renesas
IGBT TRENCH 1200V 50A TO3P

Lead Time: 9-12Days

-- --
6500
Total: $
RJP60F0DPE-00#J3
Renesas
IGBT 600V 50A 122W LDPAK

Lead Time: 9-12Days

-- --
8400
Total: $
  • 1
  • 3361
  • 3362
  • 3363
  • 3364
  • 3365
  • 6670
Go to