Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
TIG056BF
Onsemi
IGBT 400V 30W TO220

Lead Time: 9-12Days

-- --
3200
Total: $
MKP1848S61550JP2C
Vishay
CAP FILM 15UF 5% 500VDC RADIAL

MPQ: 70

Lead Time: 9-12Days

-- --
7600
Total: $
TIG066SS-TL-E
Onsemi
IGBT 400V 8SOP

Lead Time: 9-12Days

-- --
2100
Total: $
TIG110BF
Onsemi
IGBT 600V 27A 2W TO220

Lead Time: 9-12Days

-- --
4000
Total: $
F339MX252231JKP2T0
Vishay
CAP FILM 2.2UF 5% 630VDC RADIAL

MPQ: 100

Lead Time: 9-12Days

-- --
4600
Total: $
F339MX252231JKM2T0
Vishay
CAP FILM 2.2UF 5% 630VDC RADIAL

MPQ: 100

Lead Time: 9-12Days

-- --
7400
Total: $
RJH1BF7RDPQ-80#T2
Renesas
IGBT 1100V 60A TO-247

Lead Time: 9-12Days

-- --
6700
Total: $
F339MX252231JKI2B0
Vishay
CAP FILM 2.2UF 5% 630VDC RADIAL

MPQ: 125

Lead Time: 9-12Days

-- --
1900
Total: $
RJH1CF7RDPQ-80#T2
Renesas
IGBT 1200V 60A 250W TO247

Lead Time: 9-12Days

-- --
500
Total: $
RJH60D0DPK-00#T0
Renesas
IGBT TRENCH 600V 45A TO-3P

Lead Time: 9-12Days

-- --
0
Total: $
RJH60D0DPM-00#T1
Renesas
IGBT TRENCH 600V 45A TO-3PFM

Lead Time: 9-12Days

-- --
1900
Total: $
BFC237892273
Vishay
CAP FILM 0.027UF 5% 2KVDC RADIAL

MPQ: 100

Lead Time: 9-12Days

-- --
1700
Total: $
RJH60D1DPP-M0#T2
Renesas
IGBT TRENCH 600V 20A TO-220FL

Lead Time: 9-12Days

-- --
1200
Total: $
RJH60D2DPP-M0#T2
Renesas
IGBT TRENCH 600V 25A TO-220FL

Lead Time: 9-12Days

-- --
8300
Total: $
BFC237882513
Vishay
CAP FILM 0.051UF 5% 1.6KVDC RAD

MPQ: 100

Lead Time: 9-12Days

-- --
3600
Total: $
RJH60D3DPP-M0#T2
Renesas
IGBT TRENCH 600V 35A TO-220FL

Lead Time: 9-12Days

-- --
5300
Total: $
942C10P68K-F
Cornell Dubilier
CAP FILM 0.68UF 10% 1KVDC AXIAL

Lead Time: 9-12Days

-- --
1100
Total: $
RJH60D5DPK-00#T0
Renesas
IGBT TRENCH 600V 75A TO3P

Lead Time: 9-12Days

-- --
900
Total: $
930C1W1P8K-F
Cornell Dubilier
CAP FILM 1.8UF 10% 100VDC AXIAL

Lead Time: 9-12Days

-- --
5600
Total: $
RJH60D6DPK-00#T0
Renesas
IGBT TRENCH 600V 80A TO-3P

Lead Time: 9-12Days

-- --
6800
Total: $
  • 1
  • 3358
  • 3359
  • 3360
  • 3361
  • 3362
  • 6670
Go to