Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MKP383422200JPP2T0
Vishay
CAP FILM 0.22UF 5% 2KVDC RADIAL

MPQ: 105

Lead Time: 9-12Days

-- --
4100
Total: $
IRG7PH42UD1PBF
Infineon
IGBT TRENCH 1200V 85A TO-247AC

Lead Time: 9-12Days

-- --
2500
Total: $
IRG7PSH73K10PBF
Infineon
IGBT TRENCH 1200V 220A SUPER247

Lead Time: 9-12Days

-- --
6900
Total: $
MKP383422200JPI2T0
Vishay
CAP FILM 0.22UF 5% 2KVDC RADIAL

MPQ: 105

Lead Time: 9-12Days

-- --
3900
Total: $
IRGI4086PBF
Infineon
IGBT TRENCH 300V 25A TO220AB FP

Lead Time: 9-12Days

-- --
6700
Total: $
MKP1848612704P2
Vishay
CAP FILM 12UF 5% 700VDC RADIAL

MPQ: 105

Lead Time: 9-12Days

-- --
7100
Total: $
IRGP4063-EPBF
Infineon
IGBT TRENCH 600V 96A TO-247AD

Lead Time: 9-12Days

-- --
3400
Total: $
IRGP50B60PD1-EP
Infineon
IGBT NPT 600V 75A TO-247AD

Lead Time: 9-12Days

-- --
1600
Total: $
MKP1848610704P4
Vishay
CAP FILM 10UF 5% 700VDC RADIAL

MPQ: 105

Lead Time: 9-12Days

-- --
7300
Total: $
MKP1848590094P4
Vishay
CAP FILM 9UF 5% 900VDC RADIAL

MPQ: 105

Lead Time: 9-12Days

-- --
9600
Total: $
MKP1848580094P4
Vishay
CAP FILM 8UF 5% 900VDC RADIAL

MPQ: 105

Lead Time: 9-12Days

-- --
6800
Total: $
IRG7S313UTRLPBF
Infineon
IGBT PDP 330V 40A D2PAK

Lead Time: 9-12Days

-- --
5700
Total: $
MKP1848560924P4
Vishay
CAP FILM 6UF 5% 1.2KVDC RADIAL

MPQ: 105

Lead Time: 9-12Days

-- --
6000
Total: $
IRG4PC50F-EPBF
Infineon
IGBT 600V 70A TO-247AD

Lead Time: 9-12Days

-- --
1400
Total: $
IRG4PC50SDPBF
Infineon
IGBT 600V 70A TO-247AC

Lead Time: 9-12Days

-- --
2400
Total: $
MKP1848560914P4
Vishay
CAP FILM 6UF 5% 1.1KVDC RADIAL

MPQ: 105

Lead Time: 9-12Days

-- --
8300
Total: $
IRGP35B60PD-EP
Infineon
IGBT NPT 600V 60A TO-247AD

Lead Time: 9-12Days

-- --
3700
Total: $
MKP1845533164
Vishay
CAP FILM 3.3UF 5% 160VDC AXIAL

MPQ: 500

Lead Time: 9-12Days

-- --
7300
Total: $
IRG4BC30K-STRLP
Infineon
IGBT 600V 28A 100W D2PAK

Lead Time: 9-12Days

-- --
4800
Total: $
IRG4BC30U-STRRP
Infineon
IGBT 600V 23A 100W D2PAK

Lead Time: 9-12Days

-- --
7100
Total: $
  • 1
  • 3356
  • 3357
  • 3358
  • 3359
  • 3360
  • 6670
Go to