Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MKP1847560354P2
Vishay
CAP FILM 6UF 5% 350VAC RADIAL

MPQ: 105

Lead Time: 9-12Days

-- --
1300
Total: $
IKI04N60TXKSA1
Infineon
IGBT TRENCH FS 600V 8A TO262-3

Lead Time: 9-12Days

-- --
8500
Total: $
IKP01N120H2XKSA1
Infineon
IGBT 1200V 3.2A TO220-3

Lead Time: 9-12Days

-- --
8400
Total: $
3AG2HD
Kento

Lead Time: 9-12Days

-- --
8400
Total: $
SGB06N60ATMA1
Infineon
IGBT NPT 600V 12A TO263-3-2

Lead Time: 9-12Days

-- --
4100
Total: $
SGB10N60AATMA1
Infineon
IGBT NPT 600V 20A TO263-3-2

Lead Time: 9-12Days

-- --
4000
Total: $
MKP1848S61570JP4C
Vishay
CAP FILM 15UF 5% 700VDC RADIAL

MPQ: 49

Lead Time: 9-12Days

-- --
1600
Total: $
MKP1845533256
Vishay
CAP FILM 3.3UF 20% 250VDC AXIAL

MPQ: 400

Lead Time: 9-12Days

-- --
9500
Total: $
SGB15N60HSATMA1
Infineon
IGBT NPT 600V 27A TO263-3-2

Lead Time: 9-12Days

-- --
4300
Total: $
SGB20N60ATMA1
Infineon
IGBT NPT 600V 40A TO263-3-2

Lead Time: 9-12Days

-- --
8800
Total: $
SGB30N60ATMA1
Infineon
IGBT NPT 600V 41A TO263-3-2

Lead Time: 9-12Days

-- --
3900
Total: $
SGD04N60BUMA1
Infineon
IGBT NPT 600V 9.4A TO252-3

Lead Time: 9-12Days

-- --
1000
Total: $
SGD06N60BUMA1
Infineon
IGBT 600V 12A 68W TO252-3

Lead Time: 9-12Days

-- --
2400
Total: $
MKP1848S61550JP4B
Vishay
CAP FILM 15UF 5% 500VDC RADIAL

MPQ: 56

Lead Time: 9-12Days

-- --
7600
Total: $
SGP02N60XKSA1
Infineon
IGBT NPT 600V 6A TO220-3

Lead Time: 9-12Days

-- --
5900
Total: $
SGP06N60XKSA1
Infineon
IGBT NPT 600V 12A TO220-3

Lead Time: 9-12Days

-- --
9900
Total: $
SGP10N60AXKSA1
Infineon
IGBT NPT 600V 20A TO220-3

Lead Time: 9-12Days

-- --
1000
Total: $
SGP20N60XKSA1
Infineon
IGBT NPT 600V 40A TO220-3

Lead Time: 9-12Days

-- --
5600
Total: $
B32776E1106K000
Tdk
CAP FILM 10UF 10% 1.3KVDC RADIAL

MPQ: 440

Lead Time: 9-12Days

-- --
700
Total: $
SGP30N60HSXKSA1
Infineon
IGBT NPT 600V 41A TO220-3

Lead Time: 9-12Days

-- --
6500
Total: $
  • 1
  • 3353
  • 3354
  • 3355
  • 3356
  • 3357
  • 6670
Go to