Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
STGP8NC60K
Stmicroelectronics
IGBT 600V 15A TO-220

Lead Time: 9-12Days

-- --
100
Total: $
MKP1845447634
Vishay
CAP FILM 0.47UF 5% 630VDC AXIAL

MPQ: 500

Lead Time: 9-12Days

-- --
7700
Total: $
STGW19NC60WD
Stmicroelectronics
IGBT 600V 42A TO-247-3

Lead Time: 9-12Days

-- --
1900
Total: $
STGW30N90D
Stmicroelectronics
IGBT 900V 60A TO-247-3

Lead Time: 9-12Days

-- --
7800
Total: $
STGW35NC60WD
Stmicroelectronics
IGBT 600V 70A TO-247-3

Lead Time: 9-12Days

-- --
9500
Total: $
HGT1S12N60A4S9A
Onsemi
IGBT 600V 54A TO-263

Lead Time: 9-12Days

-- --
5400
Total: $
STGW30N120KD
Stmicroelectronics
IGBT 1200V 60A TO-247-3

Lead Time: 9-12Days

-- --
4000
Total: $
STGB20NC60V
Stmicroelectronics
IGBT 600V 60A 200W D2PAK

Lead Time: 9-12Days

-- --
2900
Total: $
STGD8NC60KT4
Stmicroelectronics
IGBT 600V 15A 62W DPAK

Lead Time: 9-12Days

-- --
6200
Total: $
126MABA02KJS
Cornell Dubilier
CAP FILM 12UF 10% 600VDC RADIAL

Lead Time: 9-12Days

-- --
6600
Total: $
IRGI4062DPBF
Infineon
IGBT TRENCH 600V 22A TO220AB FP

Lead Time: 9-12Days

-- --
4200
Total: $
IRGP30B120KDPBF
Infineon
IGBT NPT 1200V 60A TO-247AC

Lead Time: 9-12Days

-- --
6200
Total: $
475PHC700K
Cornell Dubilier
CAP FILM 4.7UF 10% 700VDC AXIAL

Lead Time: 9-12Days

-- --
9800
Total: $
FGA25N120FTD
Onsemi
IGBT TRENCH FS 1200V 50A TO-3P

Lead Time: 9-12Days

-- --
2900
Total: $
FGA90N33ATDTU
Onsemi
IGBT TRENCH 330V 90A TO3P

Lead Time: 9-12Days

-- --
5300
Total: $
FGA90N33ATTU
Onsemi
IGBT TRENCH 330V 90A TO-3P

Lead Time: 9-12Days

-- --
6600
Total: $
IRG4RC10STRRPBF
Infineon
IGBT 600V 14A TO252AA

Lead Time: 9-12Days

-- --
800
Total: $
IRGSL30B60KPBF
Infineon
IGBT NPT 600V 78A TO-262

Lead Time: 9-12Days

-- --
4200
Total: $
IRGB4045DPBF
Infineon
IGBT TRENCH 600V 12A TO-220AB

Lead Time: 9-12Days

-- --
6600
Total: $
MKP1845522406
Vishay
CAP FILM 2.2UF 20% 400VDC AXIAL

MPQ: 250

Lead Time: 9-12Days

-- --
5200
Total: $
  • 1
  • 3349
  • 3350
  • 3351
  • 3352
  • 3353
  • 6670
Go to