
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
77313-119-10LF
| Amphenol |
CONN HEADER VERT 10POS 2.54MM
| Lead Time: 9-12Days | -- -- | 1200 | Total:
$
| |
DGTD120T40S1PT
| Diodes Incorporated |
IGBT FIELD STOP 1200V 80A TO-247
| Lead Time: 9-12Days | -- -- | 2000 | Total:
$
| |
77313-115-10LF
| Amphenol |
CONN HEADER VERT 10POS 2.54MM
| Lead Time: 9-12Days | -- -- | 9700 | Total:
$
| |
SKW30N60FKSA1
| Infineon |
IGBT NPT 600V 41A TO247-3
| Lead Time: 9-12Days | -- -- | 5100 | Total:
$
| |
75844-302-10LF
| Amphenol |
CONN HEADER VERT 10POS 2.54MM
| Lead Time: 9-12Days | -- -- | 5500 | Total:
$
| |
FGH50N3
| Onsemi |
IGBT PT 300V 75A TO-247-3
| Lead Time: 9-12Days | -- -- | 3600 | Total:
$
| |
5-103326-2
| Te Connectivity |
CONN HEADER R/A 4POS 2.54MM
| Lead Time: 9-12Days | -- -- | 700 | Total:
$
| |
HGTG18N120BN
| Onsemi |
IGBT NPT 1200V 54A TO-247-3
| Lead Time: 9-12Days | -- -- | 5100 | Total:
$
| |
10076801-405-12LF
| Amphenol |
CONN HEADER VERT 12POS 2.54MM
| Lead Time: 9-12Days | -- -- | 7700 | Total:
$
| |
890-80-015-10-003101
| Preci-Dip |
CONN HEADER VERT 15POS 2.54MM
| MPQ: 970 Lead Time: 9-12Days | -- -- | 5700 | Total:
$
| |
0026604103
| Molex |
CONN HEADER VERT 10POS 3.96MM
| Lead Time: 9-12Days | -- -- | 6800 | Total:
$
| |
IRG4PC60FPBF
| Infineon |
IGBT 600V 90A TO-247AC
| Lead Time: 9-12Days | -- -- | 7200 | Total:
$
| |
RJH60D7DPK-00#T0
| Renesas |
IGBT TRENCH 600V 90A TO-3P
| Lead Time: 9-12Days | -- -- | 3500 | Total:
$
| |
TSW-202-26-F-S
| Samtec |
CONN HDR T/H .025" SQUARE P
| MPQ: 1 Lead Time: 9-12Days | -- -- | 6900 | Total:
$
| |
TSW-203-09-T-S-RE
| Samtec |
CONN HDR .200" 3POS
| MPQ: 1 Lead Time: 9-12Days | -- -- | 4400 | Total:
$
| |
IRG4PF50WDPBF
| Infineon |
IGBT 900V 51A TO-247AC
| Lead Time: 9-12Days | -- -- | 3400 | Total:
$
| |
TSW-203-09-T-S-RA
| Samtec |
CONN HDR .200" 3POS
| MPQ: 1 Lead Time: 9-12Days | -- -- | 4000 | Total:
$
| |
TSW-202-23-L-S
| Samtec |
CONN HDR .200" 2POS
| MPQ: 1 Lead Time: 9-12Days | -- -- | 1500 | Total:
$
| |
IGC27T120T8LX1SA2
| Infineon |
IGBT TRENCH FIELD STOP 1200V DIE
| Lead Time: 9-12Days | -- -- | 200 | Total:
$
| |
TMS-105-02-T-S
| Samtec |
.050" (1.27MM) MICRO HEADER
| MPQ: 1 Lead Time: 9-12Days | -- -- | 4800 | Total:
$
|