Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
0022032146
Molex
CONN HEADER VERT 14POS 2.54MM

Lead Time: 9-12Days

-- --
6800
Total: $
10137925-0411LF
Amphenol
CONN PWR3.0 R/A SMT

Lead Time: 9-12Days

-- --
9000
Total: $
STGWA15H120DF2
Stmicroelectronics
IGBT TRENCH FS 1200V 30A TO-247

MPQ: 600

Lead Time: 9-12Days

-- --
700
Total: $
STGWA15H120F2
Stmicroelectronics
IGBT HB 1200V 15A HS TO247-3

Lead Time: 9-12Days

-- --
9300
Total: $
1-2029173-0
Te Connectivity
CONN HEADER VERT 10POS 4.2MM

Lead Time: 9-12Days

-- --
8200
Total: $
IRG4PH40UDPBF
Infineon
IGBT 1200V 41A TO-247AC

Lead Time: 9-12Days

-- --
7500
Total: $
350-V3-105-00-006101
Preci-Dip
CONN HEADER VERT 5POS 2.54MM

MPQ: 1250

Lead Time: 9-12Days

-- --
1600
Total: $
SGW30N60FKSA1
Infineon
IGBT NPT 600V 41A TO247-3

Lead Time: 9-12Days

-- --
9100
Total: $
802-80-008-10-001101
Preci-Dip
CONN HEADER VERT 8POS 2.54MM

MPQ: 1000

Lead Time: 9-12Days

-- --
4300
Total: $
IRG4PC50FPBF
Infineon
IGBT 600V 70A TO-247AC

Lead Time: 9-12Days

-- --
9200
Total: $
450-80-206-00-106101
Preci-Dip
CONN HEADER SMD 6POS 2.54MM

Lead Time: 9-12Days

-- --
7100
Total: $
APT30GN60BDQ2G
Microchip
IGBT TRENCH FS 600V 63A TO247

Lead Time: 9-12Days

-- --
0
Total: $
0532583009
Molex
3.5 WTB WAFER ASSY ST 9CKT

Lead Time: 9-12Days

-- --
3500
Total: $
IRG4PH40UD2-EP
Infineon
IGBT 1200V 41A TO-247AD

Lead Time: 9-12Days

-- --
1800
Total: $
S16B-PH-KL(LF)(SN)
J.S.T.Mfg.Co.,Ltd.
CONN HEADER R/A 16POS 2MM

Lead Time: 9-12Days

-- --
700
Total: $
SGF80N60UFTU
Onsemi
IGBT 600V 80A TO-3PF

Lead Time: 9-12Days

-- --
7500
Total: $
1721730006
Molex
CONN HEADER R/A 6POS 3.96MM

Lead Time: 9-12Days

-- --
2000
Total: $
IGC18T120T8QX1SA1
Infineon
IGBT TRENCH FIELD STOP 1200V DIE

Lead Time: 9-12Days

-- --
800
Total: $
AUIRGP4062D1
Infineon
IGBT TRENCH 600V 55A TO-247AC

Lead Time: 9-12Days

-- --
2100
Total: $
890-80-014-20-001101
Preci-Dip
CONN HEADER R/A 14POS 2.54MM

MPQ: 1000

Lead Time: 9-12Days

-- --
8100
Total: $
  • 1
  • 3321
  • 3322
  • 3323
  • 3324
  • 3325
  • 6670
Go to