
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
0026487121
| Molex |
CONN HEADER VERT 12POS 3.96MM
| Lead Time: 9-12Days | -- -- | 3900 | Total:
$
| |
281696-5
| Te Connectivity |
CONN HEADER VERT 5POS 2.54MM
| Lead Time: 9-12Days | -- -- | 4500 | Total:
$
| |
292165-8
| Te Connectivity |
CONN HEADER VERT 8POS 2MM
| Lead Time: 9-12Days | -- -- | 1800 | Total:
$
| |
1969572-8
| Te Connectivity |
CONN HEADER R/A 8POS 2.5MM
| Lead Time: 9-12Days | -- -- | 4600 | Total:
$
| |
890-80-012-10-004101
| Preci-Dip |
CONN HEADER VERT 12POS 2.54MM
| MPQ: 1200 Lead Time: 9-12Days | -- -- | 1900 | Total:
$
| |
RJP60D0DPK-00#T0
| Renesas |
IGBT 600V 45A TO3P
| Lead Time: 9-12Days | -- -- | 7600 | Total:
$
| |
882-70-010-20-001101
| Preci-Dip |
CONN HEADER R/A 10POS 2MM
| MPQ: 950 Lead Time: 9-12Days | -- -- | 6900 | Total:
$
| |
FGH40T65SPD-F085
| Onsemi |
IGBT NPT 650V 80A TO-247-3
| Lead Time: 9-12Days | -- -- | 2100 | Total:
$
| |
HGT1S10N120BNS
| Onsemi |
IGBT NPT 1200V 35A TO-263
| Lead Time: 9-12Days | -- -- | 5900 | Total:
$
| |
892-70-012-20-002101
| Preci-Dip |
CONN HEADER R/A 12POS 2.54MM
| MPQ: 1125 Lead Time: 9-12Days | -- -- | 7000 | Total:
$
| |
IRG4PC40FPBF
| Infineon |
IGBT 600V 49A TO-247AC
| Lead Time: 9-12Days | -- -- | 3600 | Total:
$
| |
104432-2
| Te Connectivity |
CONN HEADER VERT 4POS 2.54MM
| Lead Time: 9-12Days | -- -- | 4800 | Total:
$
| |
SGH30N60RUFDTU
| Onsemi |
IGBT 600V 48A 235W TO3P
| Lead Time: 9-12Days | -- -- | 4100 | Total:
$
| |
SGP15N120XKSA1
| Infineon |
IGBT NPT 1200V 30A TO220-3
| Lead Time: 9-12Days | -- -- | 4500 | Total:
$
| |
0908143708
| Molex |
CONN HEADER SMD 8POS 1.27MM
| Lead Time: 9-12Days | -- -- | 5500 | Total:
$
| |
FGA5065ADF
| Onsemi |
IGBT TRENCH FS 650V 100A TO-3PN
| Lead Time: 9-12Days | -- -- | 600 | Total:
$
| |
APT20GN60BDQ1G
| Microchip |
IGBT TRENCH FS 600V 40A TO247
| Lead Time: 9-12Days | -- -- | 5500 | Total:
$
| |
0908140010
| Molex |
CONN HEADER SMD 10POS 1.27MM
| Lead Time: 9-12Days | -- -- | 9500 | Total:
$
| |
IHW40N60RFKSA1
| Infineon |
IGBT TRENCH 600V 80A TO247-3
| Lead Time: 9-12Days | -- -- | 3600 | Total:
$
| |
94278-024LF
| Amphenol |
CONN HEADER R/A 8POS 2MM
| Lead Time: 9-12Days | -- -- | 2500 | Total:
$
|