Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
NGTB15N135IHRWG
Onsemi
IGBT TRENCH FS 1350V 30A TO-247

Lead Time: 9-12Days

-- --
1600
Total: $
860-80-005-10-001101
Preci-Dip
CONN HEADER VERT 5POS 1MM

Lead Time: 9-12Days

-- --
8600
Total: $
5-292227-3
Te Connectivity
CONN HEADER SMD R/A 3POS 1.5MM

Lead Time: 9-12Days

-- --
5600
Total: $
20021121-00018C1LF
Amphenol
HD SMT

Lead Time: 9-12Days

-- --
2800
Total: $
AIKB40N65DF5ATMA1
Infineon
IGBT NPT 650V 40A TO263-3-2

MPQ: 1000

Lead Time: 9-12Days

-- --
7200
Total: $
880-70-012-20-001101
Preci-Dip
CONN HEADER R/A 12POS 2MM

MPQ: 1000

Lead Time: 9-12Days

-- --
7700
Total: $
AIKB40N65DH5ATMA1
Infineon
IGBT NPT 650V 40A TO263-3-2

MPQ: 1000

Lead Time: 9-12Days

-- --
1400
Total: $
350-80-107-00-206101
Preci-Dip
CONN HEADER SMD R/A 7POS 2.54MM

MPQ: 1000

Lead Time: 9-12Days

-- --
300
Total: $
830-80-006-40-001101
Preci-Dip
CONN HEADER SMD R/A 6POS 2MM

MPQ: 950

Lead Time: 9-12Days

-- --
6600
Total: $
STGW40NC60WD
Stmicroelectronics
IGBT 600V 70A TO-247-3

Lead Time: 9-12Days

-- --
9600
Total: $
0026503119
Molex
CONN HEADER VERT 11POS 3.96MM

Lead Time: 9-12Days

-- --
5100
Total: $
890-80-011-10-004101
Preci-Dip
CONN HEADER VERT 11POS 2.54MM

MPQ: 950

Lead Time: 9-12Days

-- --
1900
Total: $
94270-504LF
Amphenol
MTK II SMT HDR

Lead Time: 9-12Days

-- --
3900
Total: $
FGA40T65SHDF
Onsemi
IGBT TRENCH FS 650V 80A TO-3PN

Lead Time: 9-12Days

-- --
2400
Total: $
0010883061
Molex
CONN HEADER R/A 6POS 2.54MM

Lead Time: 9-12Days

-- --
100
Total: $
RJH60V2BDPP-M0#T2
Renesas
IGBT TRENCH 600V 25A TO-220FL

Lead Time: 9-12Days

-- --
6100
Total: $
SGB15N120ATMA1
Infineon
IGBT NPT 1200V 30A TO263-3-2

Lead Time: 9-12Days

-- --
5000
Total: $
STGP15M120F3
Stmicroelectronics
IGBT TRENCH FS 1200V 30A TO-220

MPQ: 50

Lead Time: 9-12Days

-- --
8500
Total: $
TSM-105-04-T-SV-TR
Samtec
CONN HEADER SMD 5POS 2.54MM

MPQ: 400

Lead Time: 9-12Days

-- --
4100
Total: $
SGW20N60FKSA1
Infineon
IGBT NPT 600V 40A TO247-3

Lead Time: 9-12Days

-- --
2800
Total: $
  • 1
  • 3314
  • 3315
  • 3316
  • 3317
  • 3318
  • 6670
Go to