
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
890-80-013-20-001101
| Preci-Dip |
CONN HEADER R/A 13POS 2.54MM
| MPQ: 950 Lead Time: 9-12Days | -- -- | 6900 | Total:
$
| |
IRG4BC40W-LPBF
| Infineon |
IGBT 600V 40A TO-262
| Lead Time: 9-12Days | -- -- | 5100 | Total:
$
| |
10127819-08212LF
| Amphenol |
CONN HEADER R/A 8POS 4.2MM
| Lead Time: 9-12Days | -- -- | 6500 | Total:
$
| |
STGWF30NC60S
| Stmicroelectronics |
IGBT 600V 35A 79W TO3P
| MPQ: 600 Lead Time: 9-12Days | -- -- | 1400 | Total:
$
| |
20021212-00010T4LF
| Amphenol |
CONN HEADER R/A 10POS 1.27MM
| Lead Time: 9-12Days | -- -- | 6000 | Total:
$
| |
STGWA8M120DF3
| Stmicroelectronics |
IGBT TRENCH FS 1200V 16A TO247
| MPQ: 600 Lead Time: 9-12Days | -- -- | 5200 | Total:
$
| |
77317-804-08LF
| Amphenol |
CONN HEADER R/A 8POS 2.54MM
| Lead Time: 9-12Days | -- -- | 4700 | Total:
$
| |
146285-3
| Te Connectivity |
CONN HEADER VERT 3POS 2.54MM
| Lead Time: 9-12Days | -- -- | 8900 | Total:
$
| |
68739-440HLF
| Amphenol |
CONN HEADER VERT 40POS 2.54MM
| Lead Time: 9-12Days | -- -- | 3700 | Total:
$
| |
NGTD20T120F2WP
| Onsemi |
IGBT TRENCH FIELD STOP 1200V DIE
| Lead Time: 9-12Days | -- -- | 6500 | Total:
$
| |
DGTD65T40S2PT
| Diodes Incorporated |
IGBT FIELD STOP 650V 80A TO-247
| Lead Time: 9-12Days | -- -- | 9400 | Total:
$
| |
AIGB40N65F5ATMA1
| Infineon |
IGBT NPT 650V 40A TO263-3-2
| MPQ: 1000 Lead Time: 9-12Days | -- -- | 6000 | Total:
$
| |
AIGB40N65H5ATMA1
| Infineon |
IGBT NPT 650V 40A TO263-3-2
| MPQ: 1000 Lead Time: 9-12Days | -- -- | 9100 | Total:
$
| |
95278-806A06LF
| Amphenol |
CONN HEADER SMD 6POS 2.54MM
| Lead Time: 9-12Days | -- -- | 6900 | Total:
$
| |
77315-813-09LF
| Amphenol |
CONN HEADER R/A 9POS 2.54MM
| Lead Time: 9-12Days | -- -- | 5200 | Total:
$
| |
NGTD20T120F2SWK
| Onsemi |
IGBT TRENCH FIELD STOP 1200V DIE
| Lead Time: 9-12Days | -- -- | 8100 | Total:
$
| |
69190-208HALF
| Amphenol |
CONN HEADER VERT 8POS 2.54MM
| Lead Time: 9-12Days | -- -- | 6900 | Total:
$
| |
77317-404-10LF
| Amphenol |
CONN HEADER R/A 10POS 2.54MM
| Lead Time: 9-12Days | -- -- | 700 | Total:
$
| |
77317-403-10LF
| Amphenol |
CONN HEADER R/A 10POS 2.54MM
| Lead Time: 9-12Days | -- -- | 4000 | Total:
$
| |
IRG4PC30FPBF
| Infineon |
IGBT 600V 31A TO-247AC
| Lead Time: 9-12Days | -- -- | 1500 | Total:
$
|