Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
IRGP4660DPBF
Infineon
IGBT 600V 100A TO-247AC

Lead Time: 9-12Days

-- --
600
Total: $
BFC237884623
Vishay
CAP FILM 0.062UF 5% 1.6KVDC RAD

MPQ: 200

Lead Time: 9-12Days

-- --
8100
Total: $
APT43GA90BD30
Microchip
IGBT PT 900V 78A TO247

Lead Time: 9-12Days

-- --
5300
Total: $
IRGP4660D-EPBF
Infineon
IGBT 600V 100A TO-247AD

Lead Time: 9-12Days

-- --
3900
Total: $
BFC237882623
Vishay
CAP FILM 0.062UF 5% 1.6KVDC RAD

MPQ: 100

Lead Time: 9-12Days

-- --
7200
Total: $
APT95GR65B2
Microchip
IGBT NPT 650V 208A TMAX

Lead Time: 9-12Days

-- --
5000
Total: $
B32758G2256J000
Tdk
CAP FILM 25UF 5% 500VDC RADIAL

MPQ: 280

Lead Time: 9-12Days

-- --
5900
Total: $
NGTB60N65FL2WG
Onsemi
IGBT FIELD STOP 650V 100A TO-247

Lead Time: 9-12Days

-- --
200
Total: $
APT50GF120LRG
Microchip
IGBT NPT 1200V 135A TO264

Lead Time: 9-12Days

-- --
9300
Total: $
MKP1847H54035KK2
Vishay
CAP FILM 4UF 10% 700VDC RADIAL

MPQ: 60

Lead Time: 9-12Days

-- --
7400
Total: $
APT45GP120BG
Microchip
IGBT PT 1200V 100A TO247

MPQ: 30

Lead Time: 9-12Days

-- --
1600
Total: $
MKP1848S61510JY2B
Vishay
CAP FILM 15UF 5% 1KVDC RADIAL

MPQ: 30

Lead Time: 9-12Days

-- --
9700
Total: $
MKP1848S63070JY6B
Vishay
CAP FILM 30UF 5% 700VDC RADIAL

Lead Time: 9-12Days

-- --
4700
Total: $
C274AC35120SA0J
Kemet(Yageo)
CAP FILM 12UF 5% 470VAC RADIAL

Lead Time: 9-12Days

-- --
5700
Total: $
FGP5N60LS
Onsemi
IGBT FIELD STOP 600V 10A TO-220

Lead Time: 9-12Days

-- --
1100
Total: $
F339MX256831JPM2T0
Vishay
CAP FILM 6.8UF 5% 630VDC RADIAL

MPQ: 60

Lead Time: 9-12Days

-- --
3000
Total: $
STGP10NB60S
Stmicroelectronics
IGBT 600V 29A TO-220

MPQ: 50

Lead Time: 9-12Days

-- --
9200
Total: $
B32758G2306K000
Tdk
CAP FILM 30UF 10% 500VDC RADIAL

MPQ: 280

Lead Time: 9-12Days

-- --
6500
Total: $
MKP385539040JPP2T0
Vishay
CAP FILM 3.9UF 5% 400VDC RADIAL

MPQ: 125

Lead Time: 9-12Days

-- --
3200
Total: $
STGP30M65DF2
Stmicroelectronics
IGBT TRENCH FS 650V 60A TO-220

MPQ: 50

Lead Time: 9-12Days

-- --
5600
Total: $
  • 1
  • 3283
  • 3284
  • 3285
  • 3286
  • 3287
  • 6670
Go to