
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
RGW00TS65DGC11
| Rohm Semiconductor |
IGBT TRENCH FS 650V 96A TO-247N
| MPQ: 450 Lead Time: 9-12Days | -- -- | 7500 | Total:
$
| |
AIKW30N60CTXKSA1
| Infineon |
IGBT TRENCH FS 600V 60A TO-247-3
| MPQ: 30 Lead Time: 9-12Days | -- -- | 2000 | Total:
$
| |
MKP1848C57012JP2
| Vishay |
CAP FILM 7UF 5% 1.2KVDC RADIAL
| MPQ: 91 Lead Time: 9-12Days | -- -- | 8300 | Total:
$
| |
RGS80TS65HRC11
| Rohm Semiconductor |
IGBT TRENCH FS 650V 73A TO-247N
| MPQ: 30 Lead Time: 9-12Days | -- -- | 3800 | Total:
$
| |
MKP1845533255
| Vishay |
CAP FILM 3.3UF 10% 250VDC AXIAL
| MPQ: 400 Lead Time: 9-12Days | -- -- | 7400 | Total:
$
| |
FGA60N60UFDTU
| Onsemi |
IGBT FIELD STOP 600V 120A TO-3PN
| Lead Time: 9-12Days | -- -- | 4000 | Total:
$
| |
BFC237874134
| Vishay |
CAP FILM 0.13UF 5% 1KVDC RADIAL
| MPQ: 200 Lead Time: 9-12Days | -- -- | 3800 | Total:
$
| |
AIGW40N65H5XKSA1
| Infineon |
IGBT TRENCH 650V 74A TO247-3-41
| Lead Time: 9-12Days | -- -- | 2000 | Total:
$
| |
BFC237872134
| Vishay |
CAP FILM 0.13UF 5% 1KVDC RADIAL
| MPQ: 100 Lead Time: 9-12Days | -- -- | 4600 | Total:
$
| |
FGH60N60UFDTU
| Onsemi |
IGBT FIELD STOP 600V 120A TO-247
| Lead Time: 9-12Days | -- -- | 1900 | Total:
$
| |
MPX336K305R
| Cornell Dubilier |
CAP FILM 33UF 10% 305VAC RADIAL
| Lead Time: 9-12Days | -- -- | 100 | Total:
$
| |
AIGW50N65F5XKSA1
| Infineon |
IGBT TRENCH 650V TO247-3-41
| MPQ: 30 Lead Time: 9-12Days | -- -- | 6200 | Total:
$
| |
MKP1848S63070JY5C
| Vishay |
CAP FILM 30UF 5% 700VDC RADIAL
| Lead Time: 9-12Days | -- -- | 5600 | Total:
$
| |
AIGW50N65H5XKSA1
| Infineon |
IGBT TRENCH 650V TO247-3-41
| Lead Time: 9-12Days | -- -- | 8800 | Total:
$
| |
474PPA202K
| Cornell Dubilier |
CAP FILM 0.47UF 10% 2KVDC AXIAL
| Lead Time: 9-12Days | -- -- | 5900 | Total:
$
| |
BFC247990147
| Vishay |
CAP FILM 2UF 5% 250VDC RADIAL
| MPQ: 300 Lead Time: 9-12Days | -- -- | 3400 | Total:
$
| |
FGH60N60SFDTU-F085
| Onsemi |
IGBT FIELD STOP 600V 120A TO-247
| Lead Time: 9-12Days | -- -- | 4600 | Total:
$
| |
B32778T0206K000
| Tdk |
CAP FILM 20UF 1.1KVDC RAD 4 LEAD
| MPQ: 560 Lead Time: 9-12Days | -- -- | 5100 | Total:
$
| |
RGTV00TS65DGC11
| Rohm Semiconductor |
IGBT TRENCH FS 650V 95A TO-247N
| MPQ: 450 Lead Time: 9-12Days | -- -- | 7900 | Total:
$
| |
BFC238354104
| Vishay |
CAP FILM 0.1UF 5% 1.6KVDC RADIAL
| MPQ: 125 Lead Time: 9-12Days | -- -- | 2700 | Total:
$
|