Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
STGW40H65DFB-4
Stmicroelectronics
IGBT TRENCH FS 650V 80A TO-247-4

MPQ: 30

Lead Time: 9-12Days

-- --
6000
Total: $
B32778H7106K000
Tdk
CAP FILM 10UF 10% 1.6KVDC RADIAL

Lead Time: 9-12Days

-- --
3600
Total: $
HGTG20N60B3
Onsemi
IGBT 600V 40A TO-247-3

Lead Time: 9-12Days

-- --
1000
Total: $
FGA50T65SHD
Onsemi
IGBT TRENCH FS 650V 100A TO-3PN

MPQ: 30

Lead Time: 9-12Days

-- --
9600
Total: $
STGW60H60DLFB
Stmicroelectronics
IGBT TRENCH FS 600V 80A TO-247

Lead Time: 9-12Days

-- --
900
Total: $
FGH50T65UPD
Onsemi
IGBT TRENCH FS 650V 100A TO-247

Lead Time: 9-12Days

-- --
5300
Total: $
BFC238340124
Vishay
CAP FILM 0.12UF 5% 1.4KVDC RAD

MPQ: 100

Lead Time: 9-12Days

-- --
5900
Total: $
NGTB30N135IHRWG
Onsemi
IGBT TRENCH FS 1350V 60A TO-247

Lead Time: 9-12Days

-- --
5600
Total: $
942C16P47K-F
Cornell Dubilier
CAP FILM 0.47UF 1.6KVDC AXIAL

Lead Time: 9-12Days

-- --
1700
Total: $
B32758G2306J000
Tdk
CAP FILM 30UF 5% 500VDC RADIAL

MPQ: 280

Lead Time: 9-12Days

-- --
0
Total: $
FGAF40N60UFDTU
Onsemi
IGBT 600V 40A TO-3PF

Lead Time: 9-12Days

-- --
6100
Total: $
C878AF45160AA1J
Kemet(Yageo)
CAP FILM 16UF 5% 470VAC RADIAL

Lead Time: 9-12Days

-- --
6200
Total: $
C870ZF35200ZC1J
Kemet(Yageo)
CAP FILM 20UF 5% 470VAC RADIAL

Lead Time: 9-12Days

-- --
3400
Total: $
FGH60N60SFDTU
Onsemi
IGBT FIELD STOP 600V 120A TO-247

Lead Time: 9-12Days

-- --
3800
Total: $
FGH25T120SMD-F155
Onsemi
IGBT TRENCH FS 1200V 50A TO-247

Lead Time: 9-12Days

-- --
1600
Total: $
BFC238354913
Vishay
CAP FILM 0.091UF 5% 1.6KVDC RAD

MPQ: 125

Lead Time: 9-12Days

-- --
3400
Total: $
NGTB40N135IHRWG
Onsemi
IGBT TRENCH FS 1350V 80A TO-247

Lead Time: 9-12Days

-- --
6400
Total: $
BFC238351913
Vishay
CAP FILM 0.091UF 5% 1.6KVDC RAD

MPQ: 100

Lead Time: 9-12Days

-- --
2700
Total: $
BFC238350913
Vishay
CAP FILM 0.091UF 5% 1.6KVDC RAD

MPQ: 100

Lead Time: 9-12Days

-- --
2300
Total: $
HGTG30N60B3
Onsemi
IGBT 600V 60A TO-247-3

Lead Time: 9-12Days

-- --
5300
Total: $
  • 1
  • 3269
  • 3270
  • 3271
  • 3272
  • 3273
  • 6670
Go to