Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
FRC0603J243 TS
Fojan
100mW 24kΩ ±5% 0603

Lead Time: 9-12Days

-- --
2100
Total: $
FRC0603F3402TS
Fojan
100mW 34kΩ ±1% 0603

Lead Time: 9-12Days

-- --
7500
Total: $
FRC0603F1151TS
Fojan
100mW 1.15kΩ ±1% 0603

Lead Time: 9-12Days

-- --
7700
Total: $
FRC0603J221 TS
Fojan
0603 220Ω ±5% 1/10W

Lead Time: 9-12Days

-- --
8900
Total: $
FRC0603F1153TS
Fojan
100mW 115kΩ ±1% 0603

Lead Time: 9-12Days

-- --
9500
Total: $
FRC0603F6342TS
Fojan
100mW 63.4kΩ ±1% 0603

Lead Time: 9-12Days

-- --
9900
Total: $
FRC0402F1023TS
Fojan
62.5mW 102kΩ ±1% 0402

Lead Time: 9-12Days

-- --
5500
Total: $
FRC0805J123 TS
Fojan
125mW 12kΩ ±5% 0805

Lead Time: 9-12Days

-- --
4500
Total: $
FRC1206F2R70TS
Fojan
250mW 2.7Ω ±1% 1206

Lead Time: 9-12Days

-- --
7900
Total: $
FRC0805F1303TS
Fojan
125mW 130kΩ ±1% 0805

Lead Time: 9-12Days

-- --
8100
Total: $
FRC1206F4991TS
Fojan
250mW 4.99kΩ ±1% 1206

Lead Time: 9-12Days

-- --
8300
Total: $
FRC0805F4021TS
Fojan
125mW 4.02kΩ ±1% 0805

Lead Time: 9-12Days

-- --
9300
Total: $
FRL1206FR200TS
Fojan
250mW 200mΩ ±1% 1206

Lead Time: 9-12Days

-- --
900
Total: $
FRC0805J823 TS
Fojan
0805 82KΩ ±5% 1/8W

Lead Time: 9-12Days

-- --
4900
Total: $
FRC1206F2400TS
Fojan
250mW 240Ω ±1% 1206

Lead Time: 9-12Days

-- --
7100
Total: $
FRC0805F3302TS
Fojan
125mW 33kΩ ±1% 0805

Lead Time: 9-12Days

-- --
7300
Total: $
FRC0805F4022TS
Fojan
125mW 40.2kΩ ±1% 0805

Lead Time: 9-12Days

-- --
500
Total: $
FRC0805F2212TS
Fojan
125mW 22.1kΩ ±1% 0805

Lead Time: 9-12Days

-- --
700
Total: $
FRC1206F2702TS
Fojan
250mW 27kΩ ±1% 1206

Lead Time: 9-12Days

-- --
1100
Total: $
FRG0603J206 TS
Fojan
100mW 20MΩ ±5% 0603

Lead Time: 9-12Days

-- --
1300
Total: $
  • 1
  • 30
  • 31
  • 32
  • 33
  • 34
  • 6854
Go to