
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
MKP383430200JPP2T0
| Vishay |
CAP FILM 0.3UF 5% 2KVDC RADIAL
| MPQ: 77 Lead Time: 9-12Days | -- -- | 2000 | Total:
$
| |
MKP383430200JPM2T0
| Vishay |
CAP FILM 0.3UF 5% 2KVDC RADIAL
| MPQ: 77 Lead Time: 9-12Days | -- -- | 1800 | Total:
$
| |
MKP383430200JPI2T0
| Vishay |
CAP FILM 0.3UF 5% 2KVDC RADIAL
| MPQ: 77 Lead Time: 9-12Days | -- -- | 4100 | Total:
$
| |
BFC237864434
| Vishay |
CAP FILM 0.43UF 5% 630VDC RADIAL
| MPQ: 200 Lead Time: 9-12Days | -- -- | 5200 | Total:
$
| |
BFC237862434
| Vishay |
CAP FILM 0.43UF 5% 630VDC RADIAL
| MPQ: 100 Lead Time: 9-12Days | -- -- | 6200 | Total:
$
| |
B32776P7226K000
| Tdk |
CAP FILM 22UF 10% 700VDC RADIAL
| MPQ: 180 Lead Time: 9-12Days | -- -- | 6400 | Total:
$
| |
BFC238364913
| Vishay |
CAP FILM 0.091UF 5% 2KVDC RADIAL
| MPQ: 100 Lead Time: 9-12Days | -- -- | 3400 | Total:
$
| |
BFC238361913
| Vishay |
CAP FILM 0.091UF 5% 2KVDC RADIAL
| MPQ: 100 Lead Time: 9-12Days | -- -- | 5000 | Total:
$
| |
BFC238360913
| Vishay |
CAP FILM 0.091UF 5% 2KVDC RADIAL
| MPQ: 100 Lead Time: 9-12Days | -- -- | 1900 | Total:
$
| |
930C1W3K-F
| Cornell Dubilier |
CAP FILM 3UF 10% 100VDC AXIAL
| Lead Time: 9-12Days | -- -- | 1600 | Total:
$
| |
BFC247990125
| Vishay |
CAP FILM 3UF 5% 160VDC RADIAL
| MPQ: 350 Lead Time: 9-12Days | -- -- | 1000 | Total:
$
| |
B32916A5225K000
| Tdk |
CAP FILM 2.2UF 10% 530VAC RADIAL
| MPQ: 640 Lead Time: 9-12Days | -- -- | 9000 | Total:
$
| |
F339MX253331JKP2T0
| Vishay |
CAP FILM 3.3UF 5% 630VDC RADIAL
| MPQ: 100 Lead Time: 9-12Days | -- -- | 9200 | Total:
$
| |
F339MX253331JKM2T0
| Vishay |
CAP FILM 3.3UF 5% 630VDC RADIAL
| MPQ: 100 Lead Time: 9-12Days | -- -- | 4400 | Total:
$
| |
BBS-102-T-C
| Samtec |
CONN HEADER VERT 2POS 2.54MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 2800 | Total:
$
| |
DF3E-10P-2V(21)
| Hirose Electric Co.,Ltd. |
CONN HEADER SMD 10POS 2MM
| Lead Time: 9-12Days | -- -- | 7600 | Total:
$
| |
A2-1PA-2.54DS(71)
| Hirose Electric Co.,Ltd. |
CONN HEADER R/A 1POS
| MPQ: 50 Lead Time: 9-12Days | -- -- | 8300 | Total:
$
| |
M20-9761442
| Harwin |
CONN HEADER VERT 28POS 2.54MM
| Lead Time: 9-12Days | -- -- | 3800 | Total:
$
| |
929836-03-02
| 3M |
CONN HEADER VERT 4POS 2.54MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 3800 | Total:
$
| |
929450-01-05-EU
| 3M |
CONN HEADER VERT 5POS 2.54MM
| Lead Time: 9-12Days | -- -- | 5600 | Total:
$
|