Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MKP385611016JKI2B0
Vishay
CAP FILM 11UF 5% 160VDC RADIAL

MPQ: 75

Lead Time: 9-12Days

-- --
400
Total: $
C870DF35350AA0J
Kemet(Yageo)
CAP FILM 35UF 5% 470VAC RADIAL

Lead Time: 9-12Days

-- --
1900
Total: $
MKP386M550085YT7
Vishay
CAP FILM 5UF 5% 850VDC SCREW

Lead Time: 9-12Days

-- --
3000
Total: $
MKP386M550085YT5
Vishay
CAP FILM 5UF 5% 850VDC SCREW

Lead Time: 9-12Days

-- --
5500
Total: $
MKP386M547085YT7
Vishay
CAP FILM 4.7UF 5% 850VDC SCREW

Lead Time: 9-12Days

-- --
100
Total: $
MKP386M547085YT5
Vishay
CAP FILM 4.7UF 5% 850VDC SCREW

Lead Time: 9-12Days

-- --
2100
Total: $
MKP386M515160YT7
Vishay
CAP FILM 1.5UF 5% 1.6KVDC SCREW

Lead Time: 9-12Days

-- --
7800
Total: $
MKP386M515160YT5
Vishay
CAP FILM 1.5UF 5% 1.6KVDC SCREW

Lead Time: 9-12Days

-- --
1100
Total: $
MKP386M550085YT8
Vishay
CAP FILM 5UF 5% 850VDC SCREW

Lead Time: 9-12Days

-- --
2400
Total: $
MKP386M550085YT6
Vishay
CAP FILM 5UF 5% 850VDC SCREW

Lead Time: 9-12Days

-- --
7400
Total: $
MKP386M550085YT4
Vishay
CAP FILM 5UF 5% 850VDC SCREW

Lead Time: 9-12Days

-- --
7600
Total: $
MKP386M550085YT2
Vishay
CAP FILM 5UF 5% 850VDC SCREW

Lead Time: 9-12Days

-- --
7600
Total: $
MKP386M550085YT1
Vishay
CAP FILM 5UF 5% 850VDC SCREW

Lead Time: 9-12Days

-- --
5900
Total: $
MKP386M547085YT8
Vishay
CAP FILM 4.7UF 5% 850VDC SCREW

Lead Time: 9-12Days

-- --
2600
Total: $
MKP386M547085YT6
Vishay
CAP FILM 4.7UF 5% 850VDC SCREW

Lead Time: 9-12Days

-- --
7100
Total: $
MKP386M547085YT4
Vishay
CAP FILM 4.7UF 5% 850VDC SCREW

Lead Time: 9-12Days

-- --
6600
Total: $
MKP386M547085YT2
Vishay
CAP FILM 4.7UF 5% 850VDC SCREW

Lead Time: 9-12Days

-- --
2200
Total: $
MKP386M547085YT1
Vishay
CAP FILM 4.7UF 5% 850VDC SCREW

Lead Time: 9-12Days

-- --
400
Total: $
MKP386M540100YT8
Vishay
CAP FILM 4UF 5% 1KVDC SCREW

Lead Time: 9-12Days

-- --
3200
Total: $
MKP386M540100YT6
Vishay
CAP FILM 4UF 5% 1KVDC SCREW

Lead Time: 9-12Days

-- --
6600
Total: $
  • 1
  • 3106
  • 3107
  • 3108
  • 3109
  • 3110
  • 6670
Go to