Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
FRC2512J4R7 TS
Fojan
1W 4.7Ω ±5% 2512

Lead Time: 9-12Days

-- --
3500
Total: $
FRC2512J301 TS
Fojan
1W 300Ω ±5% 2512

Lead Time: 9-12Days

-- --
3700
Total: $
FRP2512J150 TS
Fojan
2W 15Ω ±5% 2512

Lead Time: 9-12Days

-- --
2700
Total: $
FRM252WJR010TN
Fojan
/ 2W 10mΩ ±5% 2512

Lead Time: 9-12Days

-- --
3300
Total: $
FCC1206B471K102DT
Fojan
MLCC 1kV ±10% 470pF X7R 1206

Lead Time: 9-12Days

-- --
2900
Total: $
FCC1206B103K500DT
Fojan
MLCC 50V ±10% 10nF X7R 1206

Lead Time: 9-12Days

-- --
3900
Total: $
FRC0603F2323TS
Fojan
100mW 232kΩ ±1% 0603

Lead Time: 9-12Days

-- --
6300
Total: $
FRC0603J300 TS
Fojan
100mW 30Ω ±5% 0603

Lead Time: 9-12Days

-- --
6700
Total: $
FRC0603F2491TS
Fojan
100mW 2.49kΩ ±1% 0603

Lead Time: 9-12Days

-- --
1500
Total: $
FRC0603F2200TS
Fojan
100mW 220Ω ±1% 0603

Lead Time: 9-12Days

-- --
2300
Total: $
FRC0603F2102TS
Fojan
100mW 21kΩ ±1% 0603

Lead Time: 9-12Days

-- --
4300
Total: $
FCC0603N120J500CT
Fojan
MLCC 50V ±5% 12pF C0G 0603

Lead Time: 9-12Days

-- --
3100
Total: $
FCC0402N3R0C500AT
Fojan
MLCC 50V 3pF C0G 0402

Lead Time: 9-12Days

-- --
4700
Total: $
FRC0402F4993TS
Fojan
62.5mW 499kΩ ±1% 0402

Lead Time: 9-12Days

-- --
5100
Total: $
FRC0402F62R0TS
Fojan
62.5mW 62Ω ±1% 0402

Lead Time: 9-12Days

-- --
5300
Total: $
FRC0402J623 TS
Fojan

Lead Time: 9-12Days

-- --
5700
Total: $
FRC0402F9102TS
Fojan
62.5mW 91kΩ ±1% 0402

Lead Time: 9-12Days

-- --
5900
Total: $
FRC0603F8250TS
Fojan
100mW 825Ω ±1% 0603

Lead Time: 9-12Days

-- --
6500
Total: $
FRC0603J241 TS
Fojan
100mW 240Ω ±5% 0603

Lead Time: 9-12Days

-- --
100
Total: $
FRC0603F4751TS
Fojan
100mW 4.75kΩ ±1% 0603

Lead Time: 9-12Days

-- --
1900
Total: $
  • 1
  • 29
  • 30
  • 31
  • 32
  • 33
  • 6854
Go to