Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MMC5.7104K100J35TR12
Kemet(Yageo)
CAP FILM 0.1UF 10% 100VDC 2220

MPQ: 2100

Lead Time: 9-12Days

-- --
4800
Total: $
MSDM150-12
Microchip
BRIDGE RECT 3P 1.2KV 150A M3-1

MPQ: 1

Lead Time: 9-12Days

-- --
3900
Total: $
MSDM150-16
Microchip
BRIDGE RECT 3P 1.6KV 150A M3-1

MPQ: 1

Lead Time: 9-12Days

-- --
9600
Total: $
MMC16.5685K50C31TR24
Kemet(Yageo)
CAP FILM 6.8UF 10% 50VDC 6560

MPQ: 500

Lead Time: 9-12Days

-- --
9200
Total: $
MSDM200-08
Microchip
BRIDGE RECT 3P 800V 200A M3-1

MPQ: 1

Lead Time: 9-12Days

-- --
2100
Total: $
MSDM200-12
Microchip
BRIDGE RECT 3P 1.2KV 200A M3-1

MPQ: 1

Lead Time: 9-12Days

-- --
1500
Total: $
MSDM200-18
Microchip
BRIDGE RECT 3P 1.8KV 200A M3-1

MPQ: 1

Lead Time: 9-12Days

-- --
6500
Total: $
MMC16.5156K50C31TR24
Kemet(Yageo)
CAP FILM 15UF 10% 50VDC 6560

MPQ: 500

Lead Time: 9-12Days

-- --
6200
Total: $
MSDM50-08
Microchip
BRIDGE RECT 3PHASE 800V 50A M2-1

MPQ: 1

Lead Time: 9-12Days

-- --
5200
Total: $
MSDM50-12
Microchip
BRIDGE RECT 3P 1.2KV 50A M2-1

MPQ: 1

Lead Time: 9-12Days

-- --
2500
Total: $
MSDM50-18
Microchip
BRIDGE RECT 3P 1.8KV 50A M2-1

MPQ: 1

Lead Time: 9-12Days

-- --
8200
Total: $
B32798G2756J
Tdk
CAP FILM 75UF 5% 630VDC RADIAL

MPQ: 27

Lead Time: 9-12Days

-- --
6800
Total: $
SCM205K122H1N29-F
Cornell Dubilier
CAP FILM 2UF 10% 1.2KVDC SCREW

MPQ: 10

Lead Time: 9-12Days

-- --
5800
Total: $
MSDM75-16
Microchip
BRIDGE RECT 3P 1.6KV 75A M2-1

MPQ: 1

Lead Time: 9-12Days

-- --
9000
Total: $
SCM205K122H1P29-F
Cornell Dubilier
CAP FILM 2UF 10% 1.2KVDC SCREW

MPQ: 10

Lead Time: 9-12Days

-- --
800
Total: $
MSDM75-18
Microchip
BRIDGE RECT 3P 1.8KV 75A M2-1

MPQ: 1

Lead Time: 9-12Days

-- --
7800
Total: $
0805J1000271KFT
Knowles
CAP CER 270PF 100V C0G/NP0 0805

MPQ: 3000

Lead Time: 9-12Days

-- --
1800
Total: $
APT60DF20HJ
Microchip
BRIDGE RECT 1P 200V 90A SOT-227

MPQ: 100

Lead Time: 9-12Days

-- --
1600
Total: $
0805J1000271KAT
Knowles
CAP CER 270PF 100V C0G/NP0 0805

MPQ: 3000

Lead Time: 9-12Days

-- --
2500
Total: $
0805J1000221KFT
Knowles
CAP CER 220PF 100V C0G/NP0 0805

MPQ: 3000

Lead Time: 9-12Days

-- --
900
Total: $
  • 1
  • 305
  • 306
  • 307
  • 308
  • 309
  • 133042
Go to