Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MKP385618016JPM2T0
Vishay
CAP FILM 18UF 5% 160VDC RADIAL

MPQ: 105

Lead Time: 9-12Days

-- --
9400
Total: $
MKP385618016JPI2T0
Vishay
CAP FILM 18UF 5% 160VDC RADIAL

MPQ: 105

Lead Time: 9-12Days

-- --
1600
Total: $
MKP386M560085YT7
Vishay
CAP FILM 6UF 5% 850VDC SCREW

Lead Time: 9-12Days

-- --
3700
Total: $
MKP386M560085YT5
Vishay
CAP FILM 6UF 5% 850VDC SCREW

Lead Time: 9-12Days

-- --
2400
Total: $
MKP386M560085YT3
Vishay
CAP FILM 6UF 5% 850VDC SCREW

Lead Time: 9-12Days

-- --
2100
Total: $
MKP386M520160YT7
Vishay
CAP FILM 2UF 5% 1.6KVDC SCREW

Lead Time: 9-12Days

-- --
600
Total: $
MKP386M520160YT5
Vishay
CAP FILM 2UF 5% 1.6KVDC SCREW

Lead Time: 9-12Days

-- --
6800
Total: $
MKP386M520160YT3
Vishay
CAP FILM 2UF 5% 1.6KVDC SCREW

Lead Time: 9-12Days

-- --
7100
Total: $
MKP386M560085YT8
Vishay
CAP FILM 6UF 5% 850VDC SCREW

Lead Time: 9-12Days

-- --
5400
Total: $
MKP386M560085YT6
Vishay
CAP FILM 6UF 5% 850VDC SCREW

Lead Time: 9-12Days

-- --
9500
Total: $
MKP386M560085YT4
Vishay
CAP FILM 6UF 5% 850VDC SCREW

Lead Time: 9-12Days

-- --
3600
Total: $
MKP386M560085YT2
Vishay
CAP FILM 6UF 5% 850VDC SCREW

Lead Time: 9-12Days

-- --
5000
Total: $
MKP386M560085YT1
Vishay
CAP FILM 6UF 5% 850VDC SCREW

Lead Time: 9-12Days

-- --
700
Total: $
MKP386M520160YT8
Vishay
CAP FILM 2UF 5% 1.6KVDC SCREW

Lead Time: 9-12Days

-- --
5900
Total: $
MKP386M520160YT6
Vishay
CAP FILM 2UF 5% 1.6KVDC SCREW

Lead Time: 9-12Days

-- --
2400
Total: $
MKP386M520160YT4
Vishay
CAP FILM 2UF 5% 1.6KVDC SCREW

Lead Time: 9-12Days

-- --
8400
Total: $
MKP386M520160YT2
Vishay
CAP FILM 2UF 5% 1.6KVDC SCREW

MPQ: 45

Lead Time: 9-12Days

-- --
1400
Total: $
MKP386M520160YT1
Vishay
CAP FILM 2UF 5% 1.6KVDC SCREW

Lead Time: 9-12Days

-- --
6200
Total: $
BLC200J112B4E
Cornell Dubilier
CAP FILM 20UF 5% 1.1KVDC RADIAL

MPQ: 50

Lead Time: 9-12Days

-- --
800
Total: $
MKP383515100JPP5T0
Vishay
CAP FILM 1.5UF 5% 1KVDC RADIAL

MPQ: 63

Lead Time: 9-12Days

-- --
5600
Total: $
  • 1
  • 3047
  • 3048
  • 3049
  • 3050
  • 3051
  • 6670
Go to