Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MLX90614ESF-DCI-000-TU
Melexis
SENSOR DGTL -40C-85C TO39

Lead Time: 9-12Days

-- --
4300
Total: $
P25Q80SH-SSH-IR
Puya

Lead Time: 9-12Days

-- --
3100
Total: $
PT26-71B/TR8
Everlight

Lead Time: 9-12Days

-- --
5300
Total: $
1.5SMBJ58CA
Bourns Inc.

Lead Time: 9-12Days

-- --
8900
Total: $
3RL600M-5-S
Yageo

Lead Time: 9-12Days

-- --
3300
Total: $
3RP090M-8-S
Yageo
3RP090M-8-S SMD

Lead Time: 9-12Days

-- --
3900
Total: $
1SMA5931_R1_00001
Panjit
1500mW,ZENER,SMA,18V

Lead Time: 9-12Days

-- --
2500
Total: $
BAT5402VH6327
Infineon

Lead Time: 9-12Days

-- --
7300
Total: $
BNESD9X5.0ST5G
Bourns Inc.

Lead Time: 9-12Days

-- --
6100
Total: $
BZT52B16Q
Yangjie

Lead Time: 9-12Days

-- --
7100
Total: $
DRV5011ADDMRR
Texas Instruments
DRV5011ADDMRR VSON-4-EP1.1x1.4

Lead Time: 9-12Days

-- --
9500
Total: $
CSD17578Q5A
Texas Instruments
MOSFET 42W;3.1W 30V 25A 1N VSONP-85x6

Lead Time: 9-12Days

-- --
1900
Total: $
HOJLR2512-3W-5MR-1%
Milliohm
/ 3W 5mΩ ±1% 2512

Lead Time: 9-12Days

-- --
9500
Total: $
MAX44284FAUT+T
Analog Devices
3 kHz SOT-23 6 -40 °C 125

Lead Time: 9-12Days

-- --
4500
Total: $
M8550
Bourns Inc.
BJT 200mW 25V 800mA PNP SOT-23

Lead Time: 9-12Days

-- --
8700
Total: $
P6KE11CA/B
Yageo

Lead Time: 9-12Days

-- --
1700
Total: $
RC2512FK-07120KL
Yageo
1W 120kΩ ±1% 2512

Lead Time: 9-12Days

-- --
8500
Total: $
RS1MF-LE_R1_00001
Panjit
/ 1.3V@1A 1kV 1A SMAF-1

Lead Time: 9-12Days

-- --
500
Total: $
SMAJ26CAQ
Yangjie

Lead Time: 9-12Days

-- --
6700
Total: $
SMCJ36CAQ
Yangjie

Lead Time: 9-12Days

-- --
7700
Total: $
  • 1
  • 297
  • 298
  • 299
  • 300
  • 301
  • 6854
Go to