Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
C1206C273J4JACAUTO
Kemet(Yageo)
CAP CER 0.027UF 16V U2J 1206

MPQ: 4000

Lead Time: 9-12Days

-- --
9000
Total: $
FF225R17ME4BOSA1
Infineon
IGBT MOD 1700V 340A 1500W

MPQ: 10

Lead Time: 9-12Days

-- --
200
Total: $
FD450R12KE4PHOSA1
Infineon
IGBT MODULE 1200V 450A AG62MM-1

Lead Time: 9-12Days

-- --
7700
Total: $
C1206C393J8JACAUTO
Kemet(Yageo)
CAP CER 0.039UF 10V U2J 1206

MPQ: 4000

Lead Time: 9-12Days

-- --
6400
Total: $
IFF300B12ME4PB11BPSA1
Infineon
IGBT MOD 1200V 300A 20MW ECONO

Lead Time: 9-12Days

-- --
4700
Total: $
FS100R12KT4GBOSA1
Infineon
IGBT MOD 1200V 100A 515W

MPQ: 10

Lead Time: 9-12Days

-- --
4600
Total: $
FD300R17KE4PHOSA1
Infineon
IGBT MODULE 1700V 300A AG62MM-1

Lead Time: 9-12Days

-- --
6500
Total: $
FF400R12KT3HOSA1
Infineon
IGBT MOD 1200V 580A 2000W

MPQ: 10

Lead Time: 9-12Days

-- --
8000
Total: $
FZ600R17KE4HOSA1
Infineon
IGBT MOD 1700V 1200A 3350W

MPQ: 10

Lead Time: 9-12Days

-- --
4800
Total: $
C0805X333F4HACAUTO
Kemet(Yageo)
CAP CER 0805 33NF 16V ULTRA STAB

MPQ: 2500

Lead Time: 9-12Days

-- --
2000
Total: $
FG16X7R2A684KNT06
Tdk
CAP CER 0.68UF 100V X7R RADIAL

MPQ: 2000

Lead Time: 9-12Days

-- --
1900
Total: $
0805J0160104MDT
Knowles
CAP CER 0.1UF 16V X7R 0805

MPQ: 3000

Lead Time: 9-12Days

-- --
1500
Total: $
FF600R07ME4B11BOSA1
Infineon
IGBT MOD 650V 700A 1800W

Lead Time: 9-12Days

-- --
8000
Total: $
C1206C822JARACTU
Kemet(Yageo)
CAP CER 8200PF 250V X7R 1206

MPQ: 4000

Lead Time: 9-12Days

-- --
800
Total: $
FF450R12ME4B11BPSA1
Infineon
IGBT MOD 1200V 675A 2250W

Lead Time: 9-12Days

-- --
2900
Total: $
C1206C682JARACTU
Kemet(Yageo)
CAP CER 6800PF 250V X7R 1206

MPQ: 4000

Lead Time: 9-12Days

-- --
6000
Total: $
C0805C224M3RALTU
Kemet(Yageo)
CAP CER 0.22UF 25V X7R 0805

MPQ: 4000

Lead Time: 9-12Days

-- --
2000
Total: $
2ED300C17STROHSBPSA1
Infineon
IGBT MODULE 1700V 30A

Lead Time: 9-12Days

-- --
9800
Total: $
GA1206Y105JBXBT31G
Vishay
CAP CER 1UF 25V X7R 1206

Lead Time: 9-12Days

-- --
3300
Total: $
GA1206Y105JBXBR31G
Vishay
CAP CER 1UF 25V X7R 1206

MPQ: 10000

Lead Time: 9-12Days

-- --
8200
Total: $
  • 1
  • 2985
  • 2986
  • 2987
  • 2988
  • 2989
  • 6670
Go to