Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
C336C362KAG5TA
Kemet(Yageo)
CAP CER RAD 3.6NF 250V C0G 10%

Lead Time: 9-12Days

-- --
6100
Total: $
C336C332KAG5TA
Kemet(Yageo)
CAP CER RAD 3.3NF 250V C0G 10%

Lead Time: 9-12Days

-- --
9700
Total: $
C336C302KAG5TA
Kemet(Yageo)
CAP CER RAD 3NF 250V C0G 10%

Lead Time: 9-12Days

-- --
5000
Total: $
C336C333K1G5TA
Kemet(Yageo)
CAP CER RAD 33NF 100V C0G 10%

Lead Time: 9-12Days

-- --
4000
Total: $
C336C473K5G5TA
Kemet(Yageo)
CAP CER RAD 47NF 50V C0G 10%

Lead Time: 9-12Days

-- --
9200
Total: $
C336C393K5G5TA
Kemet(Yageo)
CAP CER RAD 39NF 50V C0G 10%

Lead Time: 9-12Days

-- --
2800
Total: $
APTGT600A60G
Microchip
IGBT MODULE 600V 700A 2300W SP6

MPQ: 1

Lead Time: 9-12Days

-- --
3600
Total: $
C336C333K5G5TA
Kemet(Yageo)
CAP CER RAD 33NF 50V C0G 10%

Lead Time: 9-12Days

-- --
8200
Total: $
C335C123KAG5TA
Kemet(Yageo)
CAP CER RAD 12NF 250V C0G 10%

Lead Time: 9-12Days

-- --
6600
Total: $
APT200GN60J
Microchip
IGBT MOD 600V 283A 682W ISOTOP

Lead Time: 9-12Days

-- --
7200
Total: $
C335C103KAG5TA
Kemet(Yageo)
CAP CER RAD 10NF 250V C0G 10%

Lead Time: 9-12Days

-- --
2400
Total: $
C335C912KAG5TA
Kemet(Yageo)
CAP CER RAD 9.1NF 250V C0G 10%

Lead Time: 9-12Days

-- --
6500
Total: $
APT45GP120JDQ2
Microchip
IGBT MOD 1200V 75A 329W ISOTOP

Lead Time: 9-12Days

-- --
9200
Total: $
C335C822KAG5TA
Kemet(Yageo)
CAP CER RAD 8.2NF 250V C0G 10%

Lead Time: 9-12Days

-- --
7700
Total: $
DDB6U134N16RRBOSA1
Infineon
IGBT MOD 1600V 70A 500W

Lead Time: 9-12Days

-- --
7600
Total: $
C335C752KAG5TA
Kemet(Yageo)
CAP CER RAD 7.5NF 250V C0G 10%

Lead Time: 9-12Days

-- --
9400
Total: $
FF200R06KE3HOSA1
Infineon
IGBT MOD 600V 260A 680W

MPQ: 10

Lead Time: 9-12Days

-- --
4700
Total: $
C335C682KAG5TA
Kemet(Yageo)
CAP CER RAD 6.8NF 250V C0G 10%

Lead Time: 9-12Days

-- --
4400
Total: $
C335C622KAG5TA
Kemet(Yageo)
CAP CER RAD 6.2NF 250V C0G 10%

Lead Time: 9-12Days

-- --
9200
Total: $
C335C562KAG5TA
Kemet(Yageo)
CAP CER RAD 5.6NF 250V C0G 10%

Lead Time: 9-12Days

-- --
2200
Total: $
  • 1
  • 2973
  • 2974
  • 2975
  • 2976
  • 2977
  • 6670
Go to