Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MTMM-103-05-F-S-200
Samtec
CONN HEADER VERT 3POS 2MM

MPQ: 1

Lead Time: 9-12Days

-- --
6900
Total: $
MKP385512160JPM4T0
Vishay
CAP FILM 1.2UF 5% 1.6KVDC RADIAL

MPQ: 63

Lead Time: 9-12Days

-- --
2800
Total: $
MTMM-103-05-F-S-196
Samtec
CONN HEADER VERT 3POS 2MM

MPQ: 1

Lead Time: 9-12Days

-- --
7800
Total: $
MKP385512160JPI5T0
Vishay
CAP FILM 1.2UF 5% 1.6KVDC RADIAL

MPQ: 63

Lead Time: 9-12Days

-- --
4500
Total: $
MKP385512160JPI4T0
Vishay
CAP FILM 1.2UF 5% 1.6KVDC RADIAL

MPQ: 63

Lead Time: 9-12Days

-- --
5100
Total: $
MTMM-103-05-F-S-190
Samtec
CONN HEADER VERT 3POS 2MM

MPQ: 1

Lead Time: 9-12Days

-- --
2200
Total: $
MKP385447250JYP2T0
Vishay
CAP FILM 0.47UF 5% 2.5KVDC RAD

MPQ: 55

Lead Time: 9-12Days

-- --
5200
Total: $
MTMM-103-05-F-S-178
Samtec
CONN HEADER VERT 3POS 2MM

MPQ: 1

Lead Time: 9-12Days

-- --
2100
Total: $
MTMM-103-05-F-S-175
Samtec
CONN HEADER VERT 3POS 2MM

MPQ: 1

Lead Time: 9-12Days

-- --
800
Total: $
MKP385447250JYM2T0
Vishay
CAP FILM 0.47UF 5% 2.5KVDC RAD

MPQ: 55

Lead Time: 9-12Days

-- --
6000
Total: $
MKP385447250JYI2T0
Vishay
CAP FILM 0.47UF 5% 2.5KVDC RAD

MPQ: 55

Lead Time: 9-12Days

-- --
5400
Total: $
MKP385439250JPP4T0
Vishay
CAP FILM 0.39UF 5% 2.5KVDC RAD

MPQ: 63

Lead Time: 9-12Days

-- --
8400
Total: $
MTMM-103-05-F-S-125
Samtec
CONN HEADER VERT 3POS 2MM

MPQ: 1

Lead Time: 9-12Days

-- --
9300
Total: $
MKP385439250JPM4T0
Vishay
CAP FILM 0.39UF 5% 2.5KVDC RAD

MPQ: 63

Lead Time: 9-12Days

-- --
5600
Total: $
MKP385439250JPI4T0
Vishay
CAP FILM 0.39UF 5% 2.5KVDC RAD

MPQ: 63

Lead Time: 9-12Days

-- --
7900
Total: $
MKP386M482125JT8
Vishay
CAP FILM 0.82UF 5% 1.25KVDC SCRW

MPQ: 42

Lead Time: 9-12Days

-- --
5600
Total: $
MKP386M482125JT6
Vishay
CAP FILM 0.82UF 5% 1.25KVDC SCRW

MPQ: 42

Lead Time: 9-12Days

-- --
2300
Total: $
MKP386M482125JT4
Vishay
CAP FILM 0.82UF 5% 1.25KVDC SCRW

MPQ: 42

Lead Time: 9-12Days

-- --
400
Total: $
MTMM-103-05-F-S-000
Samtec
CONN HEADER VERT 3POS 2MM

MPQ: 1

Lead Time: 9-12Days

-- --
3300
Total: $
MKP386M482125JT3
Vishay
CAP FILM 0.82UF 5% 1.25KVDC SCRW

MPQ: 36

Lead Time: 9-12Days

-- --
5600
Total: $
  • 1
  • 2935
  • 2936
  • 2937
  • 2938
  • 2939
  • 6670
Go to