Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
ES1JF-LE_R1_00001
Panjit

Lead Time: 9-12Days

-- --
7300
Total: $
GS1MF-LE_R1_00001
Panjit

Lead Time: 9-12Days

-- --
1900
Total: $
GRM31CR71H225KA88L
Murata
MLCC 50V ±10% 2.2uF X7R

Lead Time: 9-12Days

-- --
5100
Total: $
RC0201FR-071M5L
Yageo
50mW 1.5MΩ ±1% 0201

Lead Time: 9-12Days

-- --
6100
Total: $
HMK212C7474KGHTE
Taiyo Yuden
MLCC 100V ±10% 470nF X7S 0805

Lead Time: 9-12Days

-- --
2900
Total: $
LMK325BJ107MM-T
Taiyo Yuden
MLCC 10V ±20% 100uF X5R 1210

Lead Time: 9-12Days

-- --
4300
Total: $
PJA3440_R1_005A2
Panjit

Lead Time: 9-12Days

-- --
2700
Total: $
TCC1206X7R271K202DTS
Cctc
MLCC 2kV ±10% 270pF X7R 1206

Lead Time: 9-12Days

-- --
1300
Total: $
TCC0402COG9R0D500AT
Cctc
MLCC 50V 9pF C0G 0402

Lead Time: 9-12Days

-- --
6100
Total: $
TCC0603X7R333M500CT
Cctc
MLCC 50V ±20% 33nF X7R 0603

Lead Time: 9-12Days

-- --
1500
Total: $
TCC0603X7R223M500CT
Cctc
MLCC 50V ±20% 22nF X7R 0603

Lead Time: 9-12Days

-- --
9500
Total: $
TCC0402COG5R6D500AT
Cctc
MLCC 50V 5.6pF C0G 0402

Lead Time: 9-12Days

-- --
5900
Total: $
TCC0603X7R472M500CT
Cctc
MLCC 50V ±20% 4.7nF X7R 0603

Lead Time: 9-12Days

-- --
1700
Total: $
TCC0603X7R104M500CT
Cctc
MLCC 50V ±20% 100nF X7R 0603

Lead Time: 9-12Days

-- --
4500
Total: $
TCC0402X5R104M250AT
Cctc
MLCC 25V ±20% 100nF X5R 0402

Lead Time: 9-12Days

-- --
9900
Total: $
TCC0603X5R475M160CT
Cctc
MLCC 16V ±20% 4.7uF X5R 0603

Lead Time: 9-12Days

-- --
700
Total: $
TCC0805X7R102M500DT
Cctc
MLCC 50V ±20% 1nF X7R 0805

Lead Time: 9-12Days

-- --
8700
Total: $
TCC0805X5R105M250DT
Cctc
MLCC 25V ±20% 1uF X5R 0805

Lead Time: 9-12Days

-- --
8900
Total: $
1N5819_AY_100A1
Panjit
40V Schottky 1A

Lead Time: 9-12Days

-- --
1100
Total: $
1N5241B_AY_10001
Panjit
11V 10.45V~11.55V 2uA@8.4V DO-35

Lead Time: 9-12Days

-- --
8300
Total: $
  • 1
  • 291
  • 292
  • 293
  • 294
  • 295
  • 6854
Go to