Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
LD052C682JAB2A
Kyocera Avx Components
CAP CER SMD

Lead Time: 9-12Days

-- --
6200
Total: $
C0603X334J4RACAUTO
Kemet(Yageo)
CAP CER 0.33UF 16V X7R 0603

MPQ: 4000

Lead Time: 9-12Days

-- --
7400
Total: $
0805Y0250182KCT
Knowles
CAP CER 1800PF 25V C0G/NP0 0805

MPQ: 3000

Lead Time: 9-12Days

-- --
4700
Total: $
HBX332MBBCF0KR
Vishay
CAP CER 3300PF 2KV RADIAL

Lead Time: 9-12Days

-- --
4400
Total: $
FK26X5R1C685KN006
Tdk
CAP CER 6.8UF 16V X5R RADIAL

MPQ: 2000

Lead Time: 9-12Days

-- --
1500
Total: $
FK26X5R0J336MR006
Tdk
CAP CER 33UF 6.3V X5R RADIAL

Lead Time: 9-12Days

-- --
9600
Total: $
FK16X5R1C685KN006
Tdk
CAP CER 6.8UF 16V X5R RADIAL

MPQ: 2000

Lead Time: 9-12Days

-- --
700
Total: $
FK16X5R0J336MR006
Tdk
CAP CER 33UF 6.3V X5R RADIAL

Lead Time: 9-12Days

-- --
3100
Total: $
C430C752FAG5TA
Kemet(Yageo)
CAP CER 7500PF 250V C0G AXIAL

Lead Time: 9-12Days

-- --
0
Total: $
C430C682FAG5TA
Kemet(Yageo)
CAP CER 6800PF 250V C0G AXIAL

Lead Time: 9-12Days

-- --
1500
Total: $
C430C622FAG5TA
Kemet(Yageo)
CAP CER 6200PF 250V C0G AXIAL

MPQ: 200

Lead Time: 9-12Days

-- --
100
Total: $
C430C562FAG5TA
Kemet(Yageo)
CAP CER 5600PF 250V C0G AXIAL

Lead Time: 9-12Days

-- --
1300
Total: $
C430C512FAG5TA
Kemet(Yageo)
CAP CER 5100PF 250V C0G AXIAL

Lead Time: 9-12Days

-- --
3100
Total: $
C430C472FAG5TA
Kemet(Yageo)
CAP CER 4700PF 250V C0G AXIAL

Lead Time: 9-12Days

-- --
8300
Total: $
C430C432FAG5TA
Kemet(Yageo)
CAP CER 4300PF 250V C0G AXIAL

Lead Time: 9-12Days

-- --
2400
Total: $
C430C392FAG5TA
Kemet(Yageo)
CAP CER 3900PF 250V C0G AXIAL

Lead Time: 9-12Days

-- --
2700
Total: $
C430C362FAG5TA
Kemet(Yageo)
CAP CER 3600PF 250V C0G AXIAL

Lead Time: 9-12Days

-- --
2800
Total: $
C430C332FAG5TA
Kemet(Yageo)
CAP CER 3300PF 250V C0G AXIAL

Lead Time: 9-12Days

-- --
7200
Total: $
C430C302FAG5TA
Kemet(Yageo)
CAP CER 3000PF 250V C0G AXIAL

Lead Time: 9-12Days

-- --
1300
Total: $
C430C752F2G5TA
Kemet(Yageo)
CAP CER 7500PF 200V C0G AXIAL

Lead Time: 9-12Days

-- --
700
Total: $
  • 1
  • 2913
  • 2914
  • 2915
  • 2916
  • 2917
  • 6670
Go to