Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MRF7S21150HSR3
Nxp Semiconductors
RF MOSFET LDMOS 28V NI780

Lead Time: 9-12Days

-- --
1800
Total: $
C323C184J2R5TA7301
Kemet(Yageo)
CAP CER 0.18UF 200V X7R RADIAL

MPQ: 2500

Lead Time: 9-12Days

-- --
6700
Total: $
MRF7S27130HR3
Nxp Semiconductors
RF MOSFET LDMOS 28V NI780

Lead Time: 9-12Days

-- --
500
Total: $
C322C224JAR5TA7301
Kemet(Yageo)
CAP CER 0.22UF 250V X7R RADIAL

MPQ: 2500

Lead Time: 9-12Days

-- --
8500
Total: $
MRF7S27130HR5
Nxp Semiconductors
RF MOSFET LDMOS 28V NI780

Lead Time: 9-12Days

-- --
4700
Total: $
C322C184JAR5TA7301
Kemet(Yageo)
CAP CER 0.18UF 250V X7R RADIAL

MPQ: 2500

Lead Time: 9-12Days

-- --
600
Total: $
MRF7S27130HSR3
Nxp Semiconductors
RF MOSFET LDMOS 28V NI780

Lead Time: 9-12Days

-- --
1200
Total: $
C322C224J2R5TA7301
Kemet(Yageo)
CAP CER 0.22UF 200V X7R RADIAL

MPQ: 2500

Lead Time: 9-12Days

-- --
7600
Total: $
MRF7S38010HR3
Nxp Semiconductors
RF MOSFET LDMOS 30V NI400

Lead Time: 9-12Days

-- --
8700
Total: $
MRF7S38010HR5
Nxp Semiconductors
RF MOSFET LDMOS 30V NI400

Lead Time: 9-12Days

-- --
4800
Total: $
C322C184J2R5TA7301
Kemet(Yageo)
CAP CER 0.18UF 200V X7R RADIAL

MPQ: 2500

Lead Time: 9-12Days

-- --
600
Total: $
C320C224JAR5TA7301
Kemet(Yageo)
CAP CER 0.22UF 250V X7R RADIAL

MPQ: 2500

Lead Time: 9-12Days

-- --
3900
Total: $
C320C184JAR5TA7301
Kemet(Yageo)
CAP CER 0.18UF 250V X7R RADIAL

MPQ: 2500

Lead Time: 9-12Days

-- --
7500
Total: $
C320C224J2R5TA7301
Kemet(Yageo)
CAP CER 0.22UF 200V X7R RADIAL

MPQ: 2500

Lead Time: 9-12Days

-- --
2800
Total: $
C320C184J2R5TA7301
Kemet(Yageo)
CAP CER 0.18UF 200V X7R RADIAL

MPQ: 2500

Lead Time: 9-12Days

-- --
8300
Total: $
C1206C335M4VACTU
Kemet(Yageo)
CAP CER 3.3UF 16V Y5V 1206

MPQ: 2000

Lead Time: 9-12Days

-- --
4700
Total: $
VJ0805D220JXPAT
Vishay
CAP CER 22PF 250V C0G/NP0 0805

Lead Time: 9-12Days

-- --
1200
Total: $
VJ0805D100JXPMT
Vishay
CAP CER 10PF 250V C0G/NP0 0805

Lead Time: 9-12Days

-- --
4000
Total: $
VJ0805D100JXPMJ
Vishay
CAP CER 10PF 250V C0G/NP0 0805

Lead Time: 9-12Days

-- --
9200
Total: $
VJ0805D220JXPAJ
Vishay
CAP CER 22PF 250V NP0 0805

Lead Time: 9-12Days

-- --
3300
Total: $
  • 1
  • 2912
  • 2913
  • 2914
  • 2915
  • 2916
  • 6670
Go to