Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
B25856K755K3
Tdk
CAP FILM 7.5UF 10% 1.7KVDC AXIAL

MPQ: 1

Lead Time: 9-12Days

-- --
1700
Total: $
B25856K7505K3
Tdk
CAP FILM 5UF 10% 3KVDC AXIAL

MPQ: 1

Lead Time: 9-12Days

-- --
9400
Total: $
LTC4251-2IS6#TRPBF
Analog Devices
IC HOT SWAP CTRLR -48V SOT23-6

MPQ: 2500

Lead Time: 9-12Days

-- --
5200
Total: $
B25856K7504K13
Tdk
CAP FILM 0.5UF 10% 3KVDC AXIAL

MPQ: 5

Lead Time: 9-12Days

-- --
8500
Total: $
B25856K7405K3
Tdk
CAP FILM 4UF 10% 3KVDC AXIAL

MPQ: 1

Lead Time: 9-12Days

-- --
3900
Total: $
LTC4251IS6#TRPBF
Analog Devices
IC HOT SWAP CTRLR -48V SOT23-6

MPQ: 2500

Lead Time: 9-12Days

-- --
600
Total: $
B25856K7205K3
Tdk
CAP FILM 2UF 10% 3KVDC AXIAL

MPQ: 1

Lead Time: 9-12Days

-- --
6200
Total: $
B25856K7155K13
Tdk
CAP FILM 1.5UF 10% 3KVDC AXIAL

MPQ: 1

Lead Time: 9-12Days

-- --
6400
Total: $
B25856K7105K3
Tdk
CAP FILM 1UF 10% 3KVDC AXIAL

MPQ: 1

Lead Time: 9-12Days

-- --
2900
Total: $
LTC4251-1IS6#TRPBF
Analog Devices
IC HOT SWAP CTRLR -48V SOT23-6

MPQ: 2500

Lead Time: 9-12Days

-- --
8000
Total: $
B25856K4504K13
Tdk
CAP FILM 0.5UF 10% 2KVDC AXIAL

MPQ: 10

Lead Time: 9-12Days

-- --
8400
Total: $
B25856K4404J13
Tdk
CAP FILM 0.4UF 10% AXIAL

MPQ: 1

Lead Time: 9-12Days

-- --
2800
Total: $
B25856K3255K3
Tdk
CAP FILM 2.5UF 10% 3.3KVDC AXIAL

MPQ: 1

Lead Time: 9-12Days

-- --
4800
Total: $
LT1640AHIS8#TRPBF
Analog Devices
IC HOT SWAP CTRLR -48V 8SOIC

MPQ: 2500

Lead Time: 9-12Days

-- --
8300
Total: $
LTC4251BIS6#TRPBF
Analog Devices
IC HOT SWAP CTRLR -48V TSOT23-6

MPQ: 2500

Lead Time: 9-12Days

-- --
2800
Total: $
LTC4251BIS6-1#TRPBF
Analog Devices
IC HOT SWAP CTRLR -48V TSOT23-6

MPQ: 2500

Lead Time: 9-12Days

-- --
6300
Total: $
LTC4251BIS6-2#TRPBF
Analog Devices
IC HOT SWAP CTRLR -48V TSOT23-6

MPQ: 2500

Lead Time: 9-12Days

-- --
8100
Total: $
LTC4252-2IMS8#PBF
Analog Devices
IC HOT SWAP CTRLR -48V 8MSOP

MPQ: 50

Lead Time: 9-12Days

-- --
9500
Total: $
LTC4251-1IS6#TRMPBF
Analog Devices
IC HOT SWAP CTRLR -48V SOT23-6

MPQ: 500

Lead Time: 9-12Days

-- --
1200
Total: $
B25856K2504K3
Tdk
CAP FILM 0.5UF 10% 4KVDC AXIAL

MPQ: 1

Lead Time: 9-12Days

-- --
7900
Total: $
  • 1
  • 288
  • 289
  • 290
  • 291
  • 292
  • 6654
Go to