Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
PD84010S-E
Stmicroelectronics
RF MOSFET LDMOS 7.5V PWRSO-10RF

Lead Time: 9-12Days

-- --
4200
Total: $
MKP386M520100JT2
Vishay
CAP FILM 2UF 5% 1KVDC SCREW

MPQ: 63

Lead Time: 9-12Days

-- --
6200
Total: $
MKP386M518125JT8
Vishay
CAP FILM 1.8UF 5% 1.25KVDC SCREW

MPQ: 63

Lead Time: 9-12Days

-- --
400
Total: $
BF1100R,235
Nxp Semiconductors
RF MOSFET 9V SOT143R

MPQ: 10000

Lead Time: 9-12Days

-- --
0
Total: $
BF862,235
Nxp Semiconductors
RF MOSFET JFET SOT23

Lead Time: 9-12Days

-- --
9700
Total: $
BF862,215
Nxp Semiconductors
RF MOSFET JFET SOT23

MPQ: 3000

Lead Time: 9-12Days

-- --
3800
Total: $
MKP386M518125JT6
Vishay
CAP FILM 1.8UF 5% 1.25KVDC SCREW

MPQ: 63

Lead Time: 9-12Days

-- --
8900
Total: $
BF1202WR,115
Nxp Semiconductors
RF MOSFET 5V CMPAK-4

Lead Time: 9-12Days

-- --
2700
Total: $
BF908WR,115
Nxp Semiconductors
RF MOSFET 8V CMPAK-4

MPQ: 3000

Lead Time: 9-12Days

-- --
5700
Total: $
MKP386M518125JT4
Vishay
CAP FILM 1.8UF 5% 1.25KVDC SCREW

MPQ: 63

Lead Time: 9-12Days

-- --
5100
Total: $
BF1100,215
Nxp Semiconductors
RF MOSFET 9V SOT143B

MPQ: 3000

Lead Time: 9-12Days

-- --
1000
Total: $
MKP386M518125JT3
Vishay
CAP FILM 1.8UF 5% 1.25KVDC SCREW

MPQ: 54

Lead Time: 9-12Days

-- --
8500
Total: $
MKP386M518125JT2
Vishay
CAP FILM 1.8UF 5% 1.25KVDC SCREW

MPQ: 63

Lead Time: 9-12Days

-- --
2600
Total: $
J310
Onsemi
RF MOSFET JFET 10V TO92

MPQ: 1000

Lead Time: 9-12Days

-- --
6500
Total: $
MKP386M518125JT1
Vishay
CAP FILM 1.8UF 5% 1.25KVDC SCREW

MPQ: 63

Lead Time: 9-12Days

-- --
5400
Total: $
ATF-34143-TR1
Broadcom(Avago)
RF MOSFET PHEMT FET 4V SOT343

Lead Time: 9-12Days

-- --
1900
Total: $
ATF-54143-TR1
Broadcom(Avago)
RF MOSFET PHEMT FET 3V SOT343

MPQ: 3000

Lead Time: 9-12Days

-- --
4200
Total: $
MKP386M515125JT8
Vishay
CAP FILM 1.5UF 5% 1.25KVDC SCREW

MPQ: 63

Lead Time: 9-12Days

-- --
5600
Total: $
ATF-55143-TR1
Broadcom(Avago)
RF MOSFET E-PHEMT 2.7V SOT343

Lead Time: 9-12Days

-- --
4200
Total: $
ATF-551M4-TR1
Broadcom(Avago)
RF MOSFET PHEMT FET 2.7V MINIPAK

Lead Time: 9-12Days

-- --
4100
Total: $
  • 1
  • 2870
  • 2871
  • 2872
  • 2873
  • 2874
  • 6670
Go to