Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MRF8P8300HSR6
Nxp Semiconductors
RF MOSFET LDMOS 28V NI1230

MPQ: 150

Lead Time: 9-12Days

-- --
2900
Total: $
MKP386M515085JT3
Vishay
CAP FILM 1.5UF 5% 850VDC SCREW

MPQ: 36

Lead Time: 9-12Days

-- --
8400
Total: $
A2T21H360-24SR6
Nxp Semiconductors
RF MOSFET LDMOS 28V NI1230

MPQ: 150

Lead Time: 9-12Days

-- --
9700
Total: $
MKP386M515085JT2
Vishay
CAP FILM 1.5UF 5% 850VDC SCREW

MPQ: 42

Lead Time: 9-12Days

-- --
1500
Total: $
MKP386M515085JT1
Vishay
CAP FILM 1.5UF 5% 850VDC SCREW

MPQ: 42

Lead Time: 9-12Days

-- --
600
Total: $
MMRF1306HR5
Nxp Semiconductors
RF MOSFET LDMOS 50V NI1230

MPQ: 50

Lead Time: 9-12Days

-- --
5200
Total: $
MKP386M512125JT8
Vishay
CAP FILM 1.2UF 5% 1.25KVDC SCREW

MPQ: 42

Lead Time: 9-12Days

-- --
9400
Total: $
MRFE6VP61K25GSR5
Nxp Semiconductors
RF MOSFET LDMOS 50V NI1230

MPQ: 50

Lead Time: 9-12Days

-- --
8700
Total: $
MKP386M512125JT6
Vishay
CAP FILM 1.2UF 5% 1.25KVDC SCREW

MPQ: 42

Lead Time: 9-12Days

-- --
7400
Total: $
MMRF1023HSR5
Nxp Semiconductors
RF MOSFET LDMOS 28V NI1230

MPQ: 50

Lead Time: 9-12Days

-- --
5500
Total: $
MKP386M512125JT4
Vishay
CAP FILM 1.2UF 5% 1.25KVDC SCREW

MPQ: 42

Lead Time: 9-12Days

-- --
8700
Total: $
A2T21H410-24SR6
Nxp Semiconductors
RF MOSFET LDMOS 28V NI1230

MPQ: 150

Lead Time: 9-12Days

-- --
2700
Total: $
MMRF1308HSR5
Nxp Semiconductors
RF MOSFET LDMOS 50V NI1230

MPQ: 50

Lead Time: 9-12Days

-- --
8800
Total: $
MKP386M512125JT3
Vishay
CAP FILM 1.2UF 5% 1.25KVDC SCREW

MPQ: 36

Lead Time: 9-12Days

-- --
2000
Total: $
MKP386M512125JT2
Vishay
CAP FILM 1.2UF 5% 1.25KVDC SCREW

MPQ: 42

Lead Time: 9-12Days

-- --
3700
Total: $
MKP386M512125JT1
Vishay
CAP FILM 1.2UF 5% 1.25KVDC SCREW

MPQ: 42

Lead Time: 9-12Days

-- --
5100
Total: $
A2T18S260W12NR3
Nxp Semiconductors
RF MOSFET LDMOS 28V OM880X-2L2L

MPQ: 250

Lead Time: 9-12Days

-- --
9600
Total: $
MKP386M510160JT8
Vishay
CAP FILM 1UF 5% 1.6KVDC SCREW

MPQ: 42

Lead Time: 9-12Days

-- --
6300
Total: $
MKP386M510160JT6
Vishay
CAP FILM 1UF 5% 1.6KVDC SCREW

MPQ: 42

Lead Time: 9-12Days

-- --
4900
Total: $
MKP386M510160JT3
Vishay
CAP FILM 1UF 5% 1.6KVDC SCREW

MPQ: 36

Lead Time: 9-12Days

-- --
6600
Total: $
  • 1
  • 2859
  • 2860
  • 2861
  • 2862
  • 2863
  • 6670
Go to