Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MKP385E56840KPP4T0
Vishay
CAP FILM 6.8UF 400VDC RAD

MPQ: 91

Lead Time: 9-12Days

-- --
6700
Total: $
NSVUMC3NT1G
Onsemi
TRANS NPN/PNP PREBIAS 0.15W SC88

Lead Time: 9-12Days

-- --
3700
Total: $
NSVBC114YDXV6T1G
Onsemi
TRANS PREBIAS 2NPN 50V SOT563

Lead Time: 9-12Days

-- --
6700
Total: $
MKP385E52285JPP4T0
Vishay
CAP FILM 2.2UF 5% 850VDC RAD

MPQ: 105

Lead Time: 9-12Days

-- --
3200
Total: $
MKP385E52285JPM4T0
Vishay
CAP FILM 2.2UF 5% 850VDC RAD

MPQ: 105

Lead Time: 9-12Days

-- --
5600
Total: $
NSVBA114YDXV6T1G
Onsemi
TRANS PREBIAS 2PNP 50V SOT563

MPQ: 4000

Lead Time: 9-12Days

-- --
0
Total: $
MKP385E52285JPM2T0
Vishay
CAP FILM 2.2UF 5% 850VDC RAD

MPQ: 105

Lead Time: 9-12Days

-- --
1500
Total: $
MKP385E52285JPP2T0
Vishay
CAP FILM 2.2UF 5% 850VDC RAD

MPQ: 105

Lead Time: 9-12Days

-- --
1400
Total: $
NSVBC124EDXV6T1G
Onsemi
TRANS PREBIAS 2NPN 50V SOT563

MPQ: 4000

Lead Time: 9-12Days

-- --
6800
Total: $
MKP385E51810JPM2T0
Vishay
CAP FILM 1.8UF 5% 1KVDC RAD

MPQ: 91

Lead Time: 9-12Days

-- --
7200
Total: $
MKP385E51810JPP2T0
Vishay
CAP FILM 1.8UF 5% 1KVDC RAD

MPQ: 91

Lead Time: 9-12Days

-- --
4500
Total: $
NSVB143ZPDXV6T1G
Onsemi
TRANS PREBIAS NPN/PNP 50V SOT563

MPQ: 4000

Lead Time: 9-12Days

-- --
7100
Total: $
MKP385E4392AKPM2T0
Vishay
CAP FILM 0.39UF 10% 2KVDC RAD

MPQ: 91

Lead Time: 9-12Days

-- --
7100
Total: $
NSVBC114EDXV6T1G
Onsemi
TRANS 2NPN BIAS BIPOLAR SOT563

Lead Time: 9-12Days

-- --
2100
Total: $
NSVBC114YPDXV6T1G
Onsemi
TRANS PREBIAS NPN/PNP 50V SOT563

Lead Time: 9-12Days

-- --
4400
Total: $
MKP385E4392AKPP2T0
Vishay
CAP FILM 0.39UF 10% 2KVDC RAD

MPQ: 91

Lead Time: 9-12Days

-- --
0
Total: $
NSVBC123JPDXV6T1G
Onsemi
TRANS PREBIAS NPN/PNP 50V SOT563

Lead Time: 9-12Days

-- --
5100
Total: $
MKP385E56840KPP2T0
Vishay
CAP FILM 6.8UF 10% 400VDC RAD

MPQ: 91

Lead Time: 9-12Days

-- --
5200
Total: $
MKP385E56840KPM2T0
Vishay
CAP FILM 6.8UF 10% 400VDC RAD

MPQ: 91

Lead Time: 9-12Days

-- --
7900
Total: $
NSVBC143TPDXV6T1G
Onsemi
TRANS PREBIAS NPN/PNP 50V SOT563

Lead Time: 9-12Days

-- --
1900
Total: $
  • 1
  • 2806
  • 2807
  • 2808
  • 2809
  • 2810
  • 6854
Go to