Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
NSBA115EDXV6T1G
Onsemi
TRANS PREBIAS 2PNP 50V SOT563

Lead Time: 9-12Days

-- --
8400
Total: $
MKP385E54763JPP2T0
Vishay
CAP FILM 4.7UF 5% 630VDC RAD

MPQ: 91

Lead Time: 9-12Days

-- --
7500
Total: $
NSBA113EDXV6T1G
Onsemi
TRANS 2PNP PREBIAS 0.25W SOT563

Lead Time: 9-12Days

-- --
700
Total: $
MKP385E54763JPM2T0
Vishay
CAP FILM 4.7UF 5% 630VDC RAD

MPQ: 91

Lead Time: 9-12Days

-- --
5600
Total: $
NSBA124XDXV6T1G
Onsemi
TRANS 2PNP PREBIAS 0.5W SOT563

Lead Time: 9-12Days

-- --
300
Total: $
MKP385E4392AJPP4T0
Vishay
CAP FILM 0.39UF 5% 2KVDC RAD

MPQ: 91

Lead Time: 9-12Days

-- --
4500
Total: $
MKP385E56840JPM4T0
Vishay
CAP FILM 6.8UF 5% 400VDC RAD

MPQ: 91

Lead Time: 9-12Days

-- --
400
Total: $
NSBA144WDXV6T1G
Onsemi
TRANS 2PNP PREBIAS 0.5W SOT563

Lead Time: 9-12Days

-- --
5500
Total: $
MKP385E56840JPP4T0
Vishay
CAP FILM 6.8UF 5% 400VDC RAD

MPQ: 91

Lead Time: 9-12Days

-- --
9500
Total: $
MKP385E4392AJPM4T0
Vishay
CAP FILM 0.39UF 5% 2KVDC RAD

MPQ: 91

Lead Time: 9-12Days

-- --
4900
Total: $
NSBC144WDXV6T1G
Onsemi
TRANS PREBIAS 2NPN 50V SOT563

MPQ: 4000

Lead Time: 9-12Days

-- --
6900
Total: $
MKP385E4681AKPP4T0
Vishay
CAP FILM 0.68UF 1.6KVDC RAD

MPQ: 91

Lead Time: 9-12Days

-- --
500
Total: $
MKP385E4681AKPM4T0
Vishay
CAP FILM 0.68UF 1.6KVDC RAD

MPQ: 91

Lead Time: 9-12Days

-- --
6200
Total: $
SMUN5232DW1T1G
Onsemi
TRANS 2NPN PREBIAS 0.187W SOT363

Lead Time: 9-12Days

-- --
2700
Total: $
SMUN5330DW1T1G
Onsemi
TRANS NPN/PNP PREBIAS SOT363

Lead Time: 9-12Days

-- --
6400
Total: $
NSVMUN5133DW1T1G
Onsemi
TRANS 2PNP BRT BIPO SOT363-6

Lead Time: 9-12Days

-- --
9400
Total: $
NSVMUN5235DW1T1G
Onsemi
TRANS PREBIAS 2NPN 50V SC88

Lead Time: 9-12Days

-- --
3200
Total: $
MKP385E54763KPP4T0
Vishay
CAP FILM 4.7UF 630VDC RAD

MPQ: 91

Lead Time: 9-12Days

-- --
8200
Total: $
MKP385E54763KPM4T0
Vishay
CAP FILM 4.7UF 630VDC RAD

MPQ: 91

Lead Time: 9-12Days

-- --
3700
Total: $
MKP385E4392AJPP2T0
Vishay
CAP FILM 0.39UF 5% 2KVDC RAD

MPQ: 91

Lead Time: 9-12Days

-- --
5800
Total: $
  • 1
  • 2803
  • 2804
  • 2805
  • 2806
  • 2807
  • 6854
Go to