Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MWSA1206S-3R3MT
Sunlord
6.8mΩ 3.3uH ±20% SMD,12.6x13.45mm

Lead Time: 9-12Days

-- --
4900
Total: $
AC0603FR-07562KL
Yageo
RES SMD 562K OHM 1% 1/10W 0603

Lead Time: 9-12Days

-- --
7700
Total: $
SMAJ22CA/TR13
Yageo
TVS SMAJ22CA/TR13 22V SMADO-214AC

Lead Time: 9-12Days

-- --
8700
Total: $
CC0603KRX7R8BB124
Yageo
MLCC 25V ±10% 120nF X7R 0603

Lead Time: 9-12Days

-- --
9100
Total: $
SJD12C28L01
Yageo
ESD SJD12C28L01 SOD-123S

Lead Time: 9-12Days

-- --
9700
Total: $
SET23A12L02-E18
Yageo
ESD SET23A12L02-E18 SOT-23

Lead Time: 9-12Days

-- --
9900
Total: $
RC0201FR-076K49L
Yageo
RES SMD 6.49K OHM 1% 1/20W 0201

Lead Time: 9-12Days

-- --
6700
Total: $
AC0402FR-0786K6L
Yageo
RES SMD 86.6K OHM 1% 1/16W 0402

Lead Time: 9-12Days

-- --
6500
Total: $
1SS374(TE85L,F)
Toshiba
1 500mV@100mA 10V 100mA

Lead Time: 9-12Days

-- --
3900
Total: $
AC0201FR-07200KL
Yageo
RES SMD 200K OHM 1% 1/20W 0201

Lead Time: 9-12Days

-- --
5700
Total: $
AC0603FR-073K4L
Yageo
RES SMD 3.4K OHM 1% 1/10W 0603

Lead Time: 9-12Days

-- --
7300
Total: $
SET23A03L02
Yageo
ESD SET23A03L02 SOT-23

Lead Time: 9-12Days

-- --
100
Total: $
SMAJ70CA/TR13
Yageo
TVS SMAJ70CA/TR13 113V SMADO-214AC

Lead Time: 9-12Days

-- --
1300
Total: $
SMD1812B200TFT
Yageo
1812 2A 8V

Lead Time: 9-12Days

-- --
2500
Total: $
SMDJ28A/TR13
Yageo

Lead Time: 9-12Days

-- --
2900
Total: $
TCC0402X7R104K160AT
Cctc
MLCC 16V ±10% 100nF X7R 0402

Lead Time: 9-12Days

-- --
3100
Total: $
SMD3216-200N
Dowo

Lead Time: 9-12Days

-- --
3300
Total: $
SMD2920B075TF/60
Yageo
2920 750mA 60V

Lead Time: 9-12Days

-- --
3700
Total: $
SMBJ64A/TR13
Yageo

Lead Time: 9-12Days

-- --
4300
Total: $
SMD1812B150TF/16
Yageo
1812 1.5A 16V

Lead Time: 9-12Days

-- --
4500
Total: $
  • 1
  • 277
  • 278
  • 279
  • 280
  • 281
  • 6854
Go to