Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
FODM3052R2
Onsemi
OPTOISOLATOR 3.75KV TRIAC 4MFP

MPQ: 2500

Lead Time: 9-12Days

-- --
4800
Total: $
APTM20DUM05G
Microchip
MOSFET 2N-CH 200V 317A SP6

MPQ: 1

Lead Time: 9-12Days

-- --
7900
Total: $
GQM2195C2E4R7CB12J
Murata
CAP CER 4.7PF 250V NP0 0805

MPQ: 10000

Lead Time: 9-12Days

-- --
5200
Total: $
APTC80AM75SCG
Microchip
MOSFET 2N-CH 800V 56A SP6

MPQ: 1

Lead Time: 9-12Days

-- --
400
Total: $
GQM2195C2E4R3CB12J
Murata
CAP CER 4.3PF 250V NP0 0805

MPQ: 10000

Lead Time: 9-12Days

-- --
6400
Total: $
FODM3052R4V
Onsemi
OPTOISOLATOR 3.75KV TRIAC 4MFP

MPQ: 2500

Lead Time: 9-12Days

-- --
9400
Total: $
GQM2195C2E3R9CB12J
Murata
CAP CER 3.9PF 250V NP0 0805

MPQ: 10000

Lead Time: 9-12Days

-- --
5000
Total: $
APTM20TAM16FPG
Microchip
MOSFET 6N-CH 200V 104A SP6-P

MPQ: 1

Lead Time: 9-12Days

-- --
7500
Total: $
GQM2195C2E3R6CB12J
Murata
CAP CER 3.6PF 250V NP0 0805

MPQ: 10000

Lead Time: 9-12Days

-- --
7800
Total: $
FODM3052V
Onsemi
OPTOISOLATOR 3.75KV TRIAC 4MFP

MPQ: 3000

Lead Time: 9-12Days

-- --
8600
Total: $
GQM2195C2E3R3CB12J
Murata
CAP CER 3.3PF 250V NP0 0805

MPQ: 10000

Lead Time: 9-12Days

-- --
9900
Total: $
APTM10TAM09FPG
Microchip
MOSFET 6N-CH 100V 139A SP6-P

MPQ: 1

Lead Time: 9-12Days

-- --
2800
Total: $
GQM2195C2E2R7CB12J
Murata
CAP CER 2.7PF 250V NP0 0805

MPQ: 10000

Lead Time: 9-12Days

-- --
8000
Total: $
APTM20AM06SG
Microchip
MOSFET 2N-CH 200V 300A SP6

MPQ: 1

Lead Time: 9-12Days

-- --
8200
Total: $
GQM2195C2E2R4CB12J
Murata
CAP CER 2.4PF 250V NP0 0805

MPQ: 10000

Lead Time: 9-12Days

-- --
2000
Total: $
FODM3053R1V
Onsemi
OPTOISOLATOR 3.75KV TRIAC 4MFP

MPQ: 1000

Lead Time: 9-12Days

-- --
3800
Total: $
APTM20AM05FG
Microchip
MOSFET 2N-CH 200V 317A SP6

MPQ: 1

Lead Time: 9-12Days

-- --
6700
Total: $
GQM2195C2E2R2CB12J
Murata
CAP CER 2.2PF 250V NP0 0805

MPQ: 10000

Lead Time: 9-12Days

-- --
7300
Total: $
APTM50TAM65FPG
Microchip
MOSFET 6N-CH 500V 51A SP6-P

MPQ: 1

Lead Time: 9-12Days

-- --
9600
Total: $
GQM2195C2E1R8CB12J
Murata
CAP CER 1.8PF 250V NP0 0805

MPQ: 10000

Lead Time: 9-12Days

-- --
7100
Total: $
  • 1
  • 2779
  • 2780
  • 2781
  • 2782
  • 2783
  • 6670
Go to