Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MOC3163VM
Onsemi
OPTOISOLATOR 4.17KV TRIAC 6DIP

Lead Time: 9-12Days

-- --
4600
Total: $
BFC238683564
Vishay
CAP FILM 0.56UF 5% 1.25KVDC SCRW

MPQ: 30

Lead Time: 9-12Days

-- --
2300
Total: $
BFC238682824
Vishay
CAP FILM 0.82UF 1.25KVDC SCREW

MPQ: 30

Lead Time: 9-12Days

-- --
8000
Total: $
FOD4108TV
Onsemi
OPTOISOLATOR 5KV TRIAC 6DIP

Lead Time: 9-12Days

-- --
9900
Total: $
BFC238681564
Vishay
CAP FILM 0.56UF 5% 1.25KVDC SCRW

MPQ: 30

Lead Time: 9-12Days

-- --
100
Total: $
BFC238652394
Vishay
CAP FILM 0.39UF 10% 1.6KVDC SCRW

MPQ: 30

Lead Time: 9-12Days

-- --
6000
Total: $
FOD420TV
Onsemi
OPTOISOLATOR 5KV TRIAC 6DIP

Lead Time: 9-12Days

-- --
8400
Total: $
BFC238650394
Vishay
CAP FILM 0.39UF 10% 1.6KVDC SCRW

MPQ: 30

Lead Time: 9-12Days

-- --
100
Total: $
BFC238643394
Vishay
CAP FILM 0.39UF 5% 1.4KVDC SCREW

MPQ: 30

Lead Time: 9-12Days

-- --
0
Total: $
FOD420S
Onsemi
OPTOISOLATOR 5KV TRIAC 6SMD

Lead Time: 9-12Days

-- --
8400
Total: $
BFC238641394
Vishay
CAP FILM 0.39UF 5% 1.4KVDC SCREW

MPQ: 30

Lead Time: 9-12Days

-- --
9500
Total: $
FOD420SV
Onsemi
OPTOISOLATOR 5KV TRIAC 6SMD

Lead Time: 9-12Days

-- --
5800
Total: $
BFC238623475
Vishay
CAP FILM 4.7UF 5% 630VDC SCREW

MPQ: 30

Lead Time: 9-12Days

-- --
5500
Total: $
FOD420V
Onsemi
OPTOISOLATOR 5KV TRIAC 6DIP

Lead Time: 9-12Days

-- --
200
Total: $
BFC238621475
Vishay
CAP FILM 4.7UF 5% 630VDC SCREW

MPQ: 30

Lead Time: 9-12Days

-- --
800
Total: $
FOD420SDV
Onsemi
OPTOISOLATOR 5KV TRIAC 6SMD

Lead Time: 9-12Days

-- --
800
Total: $
BFC238602185
Vishay
CAP FILM 1.8UF 10% 850VDC SCREW

MPQ: 30

Lead Time: 9-12Days

-- --
3300
Total: $
BFC238680824
Vishay
CAP FILM 0.82UF 1.25KVDC SCREW

MPQ: 36

Lead Time: 9-12Days

-- --
500
Total: $
FOD410SV
Onsemi
OPTOISOLATOR 5KV TRIAC 6SMD

Lead Time: 9-12Days

-- --
3800
Total: $
FOD410TV
Onsemi
OPTOISOLATOR 5KV TRIAC 6DIP

Lead Time: 9-12Days

-- --
600
Total: $
  • 1
  • 2746
  • 2747
  • 2748
  • 2749
  • 2750
  • 6670
Go to